Page 5 - Aerial Mapping
P. 5

www.moniterra.engineering                                                              AERIAL MAPPING




        Carried out FLIGHTS on Projects









                                                                                                Patra’s Port

























        F.Y.R.O.MACEDONIA                                     Crvena Reka. It is part of the European Motorway Network
                                                              and refers to the Serbian region from Nis up to the Bulgarian
        Construction of 28.2 km of a new dual carriageway from   borders. It has a total length of 13 km.
        Demir Kapija to Smokvica.
                                                              Vranje

        SERBIA                                                Construction of E-75 Section Srpska Kuka - Donji Neradovac
                                                              length of 8 km of a full profile motorway.
        Pirot
        Construction of Highway E80, Section: Pirot (east)-
        Dimitrovgrad (remaining works), (total length 14.3 km).   GREECE
        Bela Palanka                                          Patra’s Port

        Construction of E-80 Motorway, section from Crvena Reka   Construction of four dock stations,  167.85m,  188.55 m,
        to Ciflic. It is part of the European Motorway Network and   218.70m  and  219.10m  long,  respectively  with  vertical
        refers to the  Serbian region from Nis  up to the Bulgarian   front from caissons  20.90m long and  11.0m wide, the
        borders. It has a total length of 12.350m.            construction of breakwater 1.176m long made of same type

        Construction of E-80 Motorway, section from Bancarevo to  of caissons as the quay wall, which shall be seated on rock-
                                                              filling prism, as well as the positioning of quay wall foot slabs
                                                              in the 1st and 2nd section.
                                                              Skouries, Chalkidiki

                                                              Mining Activity in Stratoniki, Chalkidiki a construction and
                                                              operation of a gold metallurgical plant in the Stratoni area.
                                                              Kastoria

                                                              The  project  includes  the  construction  of  the  road  section
                                                              “Koromilia – Kristalopigi, (45.4/5)”, length 16.2 km, of the
                                                              vertical road axis” Siatista – Kristalopigi” (axis 45) of Egnatia
                                                              odos  Highway.  The  section  “Koromilia  -  Kristalopigi  from
          Skouries, Chalkidiki                                km.  0+000  to  km.  16+200”  consists  of  the  subsections:



                                                                                                              5
   1   2   3   4   5   6   7   8