STEP 1:                          STEP 2:                       STEP 3:                       STEP 4:                       STEP 5:
             Focus Groups                    Member Survey                Member Review/                    Final Plan                    Member
                   &                                &                                                           &
             Strategic Plan               Campus Master Plan               Opinion Survey                 Member Vote                     Approval








        Men’s Locker Room Building Renovation Plan


        There are many areas for improvement within the existing
        Men’s Locker Room Building. Without an elevator, the building
        is inaccessible to people with disabilities. In addition, the stairs
        in the building do NOT meet current building code and are
        designed to bypass some of the floors. Finally, the space is
        not well utilized as the men’s locker area and lounge occupy
        the entire first and second floor; and the third floor, which
        overhangs the squash courts and was originally designed for
        dormitory space, is being used for storage.

        The plan proposes renovating the entire Men’s Locker Room
        Building. It would include relocating the men’s locker area to
        the third floor and the men’s lounge to the second floor. This
        would free up space on the first and second floor to expand
        the fitness area into the Men’s Locker Room Building from
        the Tennis Pavilion. There would also be additional health,
        spa and wellness amenities provided including private fitness
        studios and a massage suite. The three single hardball squash
        courts would be converted into two single international courts,
        improving access to and from the courts. This would include
        upgrading all infrastructure (which was already planned as part
        of the facility maintenance and upgrade plan) and adding a
        new elevator, connecting all three floors and the corridor from
        the Tennis Pavilion entrance.