Page 2 - REGLEMENT - VIVATECH 2018 - ACCELERATE - FR
P. 2

REGULATIONS STARTUP CORNER











                                                               visibility of the neighbouring stands and adhere to the sti-
           1. STAND INSTALLATION                               pulations of the present regulations on this point. It must

                                                               not inconvenience other exhibitors and visitors, or put
           AND COMPLIANCE                                      their safety at risk. It is also forbidden to stack goods un-
                                                               safely or in a manner deemed unsightly by the Organiser.
                                                               Exhibitors accept all risks pertaining to their own installa-
           1.1                                                 tions and are responsible for any damage resulting from
                                                               their actions, particularly from the use of water. Installa-
           Exhibitors, or their accredited representatives, are required   tion must nonetheless be carried out by qualified service
           to be present on the stand throughout the build-up phase   providers.
           and remain until it is completed. They must, in particular,
           be present during safety inspections and comply, for the   1.6
           duration of the exhibition, with the safety precautions im-
           posed by the authorities or taken by Organiser. They must   It is forbidden to modify the structures put in place by
           keep to the attendance timetable defined in the exhibition   the Organiser (stiffeners, panels, curtains, etc.), raise the
           schedule.                                           height of the partitions between the stands or extend
                                                               them out to the front edge of the stand. It is forbidden
           1.2                                                 to fix anything to the roof structure, against the walls of
                                                               the exhibition hall or against the partitions or removable
           Exhibitors, or their suppliers, must have finished build-  structures on the stands. Any installation in breach of the
           up by the date and time set by the Organiser, after which   rules set out above must be removed immediately without
           no personnel, packaging, equipment, delivery vehicles or   compensation.
           outside contractors may be present, for any reason what-
           soever, nor may they access, be kept or remain on the site   1.7
           where the exhibition is being held, however prejudicial it
           may be to the exhibitor. For safety and security reasons,   To optimise visitor circulation and avoid obstructing the
           it will not be possible to enter the hall until the exhibition   flow, the Organiser may at any time ask you to change
           opens to the public.                                the arrangement of your presentation and decorative ele-
                                                               ments in order to leave the aisles as clear as possible. The
           1.3                                                 Organiser reserves the right to remove or alter at the ex-
                                                               hibitor’s expense any installations considered to detract
           It is strictly forbidden to nail, screw, drill, stick or otherwise   from the overall appearance of the exhibition or inconve-
           attach anything to the walls, floors or any structure that   nience neighbouring exhibitors or visitors.
           forms an integral part of the building, or to the spaces,
           structures  and  decorations  provided,  which  exhibitors   1.8
           must leave in the state in which they found them.  Any
           deterioration or damage caused by their stand, including   For safety reasons, all plants and flowers on the stands
           any necessary repairs or cleaning, will be charged to the   must be placed in a leakproof container (vase, planter, jar-
           exhibitor.                                          dinière, etc.) and exhibitors are requested to ensure that
                                                               their suppliers adhere to this requirement.
           1.4
                                                               1.9
           Any exhibitor  who, for whatever reason,  is occupying
           another company’s space, shall give it up when first or-  Construction height. The maximum height of partitions,
           dered to do so and return it to its original state. If it fails to   panels and dividers is fixed at 2.5m and may not under any
           do so, it authorises the Organiser to clear the space at the   circumstances be exceeded.
           risk and expense of the exhibitor.
                                                               1.10
           1.5
                                                               Height of signs. The maximum height permitted for par-
           Individual stand decoration is carried out by the exhibitors   titions or signs is fixed at 2m20. This also applies to any
           and is entirely their responsibility. It must, in any case, tie   kind of sign or balloon, which may be illuminated but not
           in with the overall look of the exhibition, not affect the   flashing.



                                                         P. 2 / 9
   1   2   3   4   5   6   7