Page 4 - Aerotech News and Review, January 7, 2022
P. 4

2021, from 3
   flying over and it was a perfect surprise to the beginning of our   questions about quality of life issues unique to the base. Following   U.S. Department of Defense, two optical satellites for SatRevolu-
   Mojave Memorial Day Ceremony.                     the theater, she received a brief on the Enlisted Test Fundamentals   tion, and the Royal Netherlands Air Force’s first military satellite.
     June 3 — Students from the United States Air Force Test Pi-  Course at the Test Pilot School. The new course will allow enlisted   July 6 — The Air Force released a new B-21 Raider artist render-
   lot School Space Test Fundamentals Course Class 21-2 gathered   Airmen to attend the school and focus on coursework that will pro-  ing graphic with an accompanying fact sheet. As with past render-
   at Mountain Valley Airport’s glider school in Tehachapi, Calif. to   vide them with specific test skillsets.  Bass utilized many forums to   ings, this rendering is an artist’s interpretation of the B-21 design.
   strengthen their understanding of time-compressed data collection   engage with Team Edwards members. The largest forum took place   The new rendering highlights the future stealth bomber with Ed-
   practices in unfamiliar environments.  To begin the three-month STF   at Hangar 1600, where she began by thanking the Airmen for their   wards as the backdrop. The 420th Flight Test Squadron based at
   program, students from multiple branches and professions complete   hard work and sacrifice for the past year.  Edwards AFB will plan, test, analyze and report on all flight and
   Introduction Test Fundamentals, which covers a completely domain   June 30 — Virgin Orbit confirmed it successfully deployed into   ground testing of the B-21 Raider. The B-21 program continues to
   and system agnostic approach to testing. The course enables the   orbit all seven customer satellites onboard its LauncherOne rocket   execute the Engineering and Manufacturing Development phase and
   United States Space Force to enhance its Test and Evaluation mis-  during today’s Tubular Bells: Part One mission. Virgin Orbit’s 747   is focused on scaling the manufacturing infrastructure and capac-
   sion and multiply its ability to deliver combat-ready space forces.  carrier aircraft Cosmic Girl took off from Mojave Air and Space   ity across the industrial supply base to prepare for low rate initial
     June 14 — The NF-16D Variable In-flight Simulator Aircraft   Port at approximately 6:50 a.m., PDT, and flew out to a launch site   production. A critical design review conducted in 2018 concluded
   (VISTA) has been redesignated as the X-62A, effective June 14.   over the Pacific Ocean, about 50 miles south of the Channel Islands.   the aircraft has a mature and stable design.
   The VISTA, which is operated by the Air Force Test Pilot School   After a smooth release from the aircraft, the LauncherOne rocket   Designed to perform long range conventional and nuclear mis-
   with the support of Calspan and Lockheed Martin, first flew in 1992   ignited and propelled itself towards space, ultimately deploying its   sions and to operate in tomorrow’s high end threat environment, the
   and has been a staple of the TPS curriculum. It has provided TPS   payload into a precise target orbit approximately 500km above the   B-21 will be a visible and flexible component of the nuclear triad.
   students the ability to experience various flying conditions including   Earth’s surface. LauncherOne carried a total of 7 satellites to Low   July 11 — Virgin Galactic’s VSS Unity successfully reached
   simulation of other aircrafts’ characteristics.   Earth Orbit for this rideshare mission: four R&D CubeSats for the   space, completing the company’s fourth rocket-powered spaceflight.
     “For more than two decades VISTA has been a vital asset for the                                   This was the 22nd test flight of VSS Unity and the first test flight
   USAF TPS and the embodiment of our goal to be part of the cutting                                   with a full crew in the cabin, including the company’s founder, Sir
   edge of flight test and aerospace technology,” said William Gray,                                   Richard Branson. The crew fulfilled a number of test objectives
   VISTA and TPS chief test pilot. “It has given almost a thousand stu-                                related to the cabin and customer experience, including evaluating
   dents and staff members the opportunity to practice testing aircraft                                the commercial customer cabin, the views of Earth from space, the
   with dangerously poor flying qualities, and to execute risk-reduction                               conditions for conducting research and the effectiveness of the five-
   flight test programs for advanced technologies.”                                                    day pre-flight training program at Spaceport America.
     The VISTA is currently in the midst of an upgrade program which                                     Michael Colglazier, Chief Executive Officer of Virgin Galactic,
   will fully replace the VISTA Simulation System. The upgrade pro-                                    said: “Today is a landmark achievement for the Company and a
   gram will also add a new system called the System for Autonomous                                    historic moment for the new commercial space industry. With each
   Control of Simulation to support autonomy testing for the Air Force                                 successful mission we are paving the way for the next generation
   Research Laboratory’s Skyborg program.                                                              of astronauts. I want to thank our talented team, including our pilots
     June 28 — Chief Master Sgt. of the Air Force JoAnne S. Bass                                       and crew, whose dedication and commitment made today possible.
   arrived at Edwards for a two-day base tour and met with the Airmen,                                 They are helping open the door for greater access to space – so it
   families and civilians who make up Team Edwards. “I came here                                       can be for the many and not just for the few.”
   to understand this mission set that you guys are doing here in test,                                  VSS Unity achieved a speed of Mach 3 after being released from
   but I also came here because I want to hear what’s on your mind,            Air Force photograph by Christian Turner  the mothership, VMS Eve. The vehicle reached space, at an alti-
   that’s what’s most important to me,” Bass said.   The Variable In-flight Simulator Aircraft (VISTA) flies in the skies   tude of 53.5 miles, before gliding smoothly to a runway landing at
     Her first stop during her visit was to the base theater where she   over Edwards Air Force Base, California, shortly after receiving its
                                                     new paint scheme in early 2019. The aircraft was resdesignated
   addressed base leadership, squadron commanders and their su-  from NF-16D to the X-62A, June 14, 2021.   Spaceport America.
   perintendents, first sergeants and key spouses. There, she fielded                                                                   See 2021, Page 5






                                                                                #1 Homebuilder in the

                                                                                         Antelope Valley


                                                                                   $500 INCENTIVE*


                                                                                  for active military, retired, and service personnel






              NEW HOMES SELLING IN LANCASTER AND PALMDALE




                 FINAL OPPORTUNITY                              FINAL OPPORTUNITY                           COMING SOON - EARLY 2022
                    2105 Cork Oak Street                           1758 East Holguin St                           Ave. R and 35th Street
                     Palmdale, CA, 93536                           Lancaster, CA, 93535                                 Palmdale
                       (661) 742-6255                                 (661) 946-3523

                LARGE 1 & 2-STORY HOMES                         SINGLE-STORY HOMES                                1 & 2-STORY HOMES
                     2,207 - 4,679 Sq. Ft.                    CHALLENGER WAY AND AVE. I                            CLOSE TO SCHOOLS
                  Up to 5 Beds, Up to 4 Baths                       1,867-2,462 Sq. Ft.                             2,179-3,230 Sq. Ft.
                    From the $600,000’s                         Up to 5 Beds, Up to 3 Baths                     Up to 5 Beds, Up to 3 Baths
                                                                From the high $400,000’s                      Join the Interest List Online

                                             PacificCommunities.com


                                     Prices, terms, and features are subject to change without notice. Homes are subject to prior sale. Photos are representational only. Buyer must sign contract and close escrow
                                                                                                                                This promotion begins January
                                     promotion per purchase contract can be used. Cannot be combined with broker co-op.
                                     elevations, features, colors and sizes are approximate and for illustration purposes only and will vary from the homes as built. Not all features available in all plans. CA BRE
                                     License # 01154693; Contractor’s License # 660968.
                                                          Aerotech News and Review
   4                                             www.aerotechnews.com ........ facebook.com/aerotechnewsandreview                 January 7, 2022
   1   2   3   4   5   6   7   8   9