Page 10 - Trail Winds Proposal E2
P. 10

Criterion 2                                      Design Assist Projects



            Experience
                                              HCA Trinity Medical Center


                         Bed Expansion and Observa-on Unit Addi-on



































             Owner:                              Medical Center of Trinity—Main Campus
             General Contractor:                 Charles Perry Partners, Inc.
             Architect:                          Gould Turner Group, P.C.

             Engineer:                           I.C. Thomasson Associates, Inc.
             Area  :                             53,069 square feet
             Contract Executed Date:             December 1, 2016
       Tri-City Electrical Contractor, Inc.  |  Electrical Proposal
             Dura.on:                            24 months

             Medical Center of Trinity is a 278 bed, acute care hospital located in Trinity, Florida. The facility is a
             full  service  medical  center  providing  emergency,  surgical,  obstetrics  as  well  as  other  services.
             Medical Center of  Trinity is an exis.ng five story hospital that added a sixth floor to the pa.ent

             tower. This project consists of an addi.on to the first floor surgery suites and addi.on of a new
             C-sec.on room on the second floor.
             Tri-City  was  selected  to  par.cipate  in  a  pilot  program  as  a  Florida  trade  partner  to  Hospital
             Corpora.on of America (HCA). The partnership; implemented under the Design and Construc.on

             division of HCA; is a design build, design assist partnership. As part of the program, trade partners
             interact directly with the design team, HCA program managers, and general contractors by providing
             exis.ng  condi.ons  inves.ga.on  services,  procurement  advice,  on-site  constructability  reviews  as
             well as SD, DD, CD preconstruc.on services and finally our opera.ons team build the project.





      9                 Tri-City Electrical Contractor, Inc.  |  “To Do More Than Expected”  |  www.tcelectric.com
   5   6   7   8   9   10   11   12   13   14   15