Page 14 - Trail Winds Proposal E2
P. 14

Criterion 2                              Design-Bid-Build Projects



            Experience

                             Orlando Health Dr Phillips 5th Floor



          Owner:                       Orlando Health  - Dr. Phillips Hosp.al
          General Contractor:          Baron Malow
          Architect:                   HKS Inc.
          Engineer:                    TLC Engineering
          Area:                        39,000 square feet

          The project consists of 39,000 square feet of buildout and renova.on of exis.ng shell space. The project

          will be a general med/surg unit serving ortho and neuro pa.ents. A total of 48 pa.ent rooms will be add-
          ed; built under a very demanding schedule, 6 months from start to final inspec.ons.






                                                           Nemours Children’s Hospital


                                                                                        6th Floor CCU




                                                                             Owner:     Nemours Children’s Hospital
                                                                 General Contractor:                         Robins & Morton
                                                                           Architect:                      FKP Cannon Design
                                                                           Engineer:                           TLC Engineering

                                                                                          Area:                 40,000  square feet

       Tri-City Electrical Contractor, Inc.  |  Electrical Proposal



           Nemours is embarking on an expansion in which it
           will  build  out  the  unfinished  sixth  floor  atop  the
           630,000 square foot hospital. The project will add
           another  30  beds,  all  of  which  will  be  cri.cal-care
           capable  and  enable  the  hospital  to  handle  more
           cardiac and other cri.cal-care pa.ents.

           In  addi.on,  the  30  cri.cal  care  beds,  a  cardiac
           opera.ng  room  and  a  catheteriza.on  lab  were
           added  to  the  sixth  floor,  which  will  open  up  the
           hospital’s  exis.ng  cardiac  rooms  for  the      other
           procedures.






     13                 Tri-City Electrical Contractor, Inc.  |  “To Do More Than Expected”  |  www.tcelectric.com