Page 3 - FQ10538-R2.IconReadyMixLtd.Canada.DC5600 wOption
P. 3
Page No. 2
Proposal No. Q10538-R2
Date: September 12, 2017
THIS PROPOSAL INCLUDES THE FOLLOWING PARTS AND SERVICES:
One (1) Direct Contact Water Heater System Including the Following:
1. CGA Burner Assembly.
2. Inlet and outlet connection for water.
3. Inlet water distribution nozzle assembly.
4. Flanged stack connection. (20" diameter)
5. Heat transfer medium.
6. Dual walled water chamber.
7. Top access manway with cover to inspect nozzle and packing medium.
8. High alloy stainless steel fabrication.
Three (3) Stainless Steel Exhaust Stacks
1. Ten (10) feet of stainless steel exhaust stack. (20" diameter).
Note: Thirty (30) feet total.
One (1) Gas Firing and Control System Including:
1. CGA heavy duty burner.
1.1 Stainless steel inner and outer blast tube.
1.2 Full modulation control system.
2. Combustion air blower.
2.1 Stainless steel blower wheel.
2.2 3 Hp. motor.
3. Combustion air pressure sensor switch.
4. Prepiped and prewired CGA gas train including:
4.1 Main gas shutoff valve.
4.2 Main gas pressure regulator.
4.3 Main gas valve, motorized with proof of closure.
4.4 Modulating butterfly valve.
4.5 High gas pressure switch.
4.6 Low gas pressure switch.
4.7 Main gas test valve.