Page 45 - Banking Finance April 2022
P. 45

ARTICLE

             Labour: Due to the population of our country labour
             availability is not a problem but when skilled or semi
             skilled labour is required then one should ensure its
             availability for setting of the unit. Besides its availability,
             the prevailing labour wages and labour unrest is to be
             studied before setting up of any industrial unit.

             Raw Material: When the raw material is bulky and costly
             for its transportation, the unit should be set up near to
             its source and when the product is such that the quality
             may deteriorate then unit should be near to the
             market. The borrower should ensure the sources and
             availability of raw material at the location in line with
             overall cost in other areas to make the product more
             competitive. Sometimes government restriction may be
             there for the availability of the raw material, so the  different by using the alternative raw materials and
             borrower has to obtain the approval from the respective  alternate processes. We have to study the manufacturing
             government department.                           process proposed by the borrower along with any other
                                                              alternative method available for its feasibility. After studying
         We have to study the business model of the borrower for  the manufacturing process the proposed plant and
         making the raw material availability in sufficient quantity  machineries are need to be studied in line with the prices
         and in competitive rates. Availability of raw material /  of the various machineries, suppliers and manufacturing
         consumable, lead time for procurement, present prices, and  capacity. There should be balancing of the manufacturing
         arrangement for raw material storage godowns etc. needs  capacity at its manufacturing stage so that during
         to be verified.                                      manufacturing no machine remains idle.

         Manufacturing Process/Technology: The method to be used  The plant & machinery should be need based and all the
         for production / manufacturing technology proposed by the  machinery required to manufacture the product are to be
         borrower needs to be studied thoroughly. It is easy to use  included in the list of plant & machinery. The comparative
         conventional method for manufacturing but at the sametime  quotations are to be obtained to verify cost reasonableness.
         technological advancement taken up to be studied so that  The suppliers of machinery should be reputed and
         manufacturing cost is reasonable and competitive.    justification to be obtained from the borrower for selection
                                                              of machinery supplier and to be verified by Bank official from
         Sometimes the customer has proposed new technology of  similar units financed and market enquires.
         manufacturing but when he is not sure about success in the
         market then it is always risky to finance that industry.  When the borrower has second hand machineries then
                                                              residual life certificate is to be obtained from the chartered
         We also have to study the knowledge of the promoter or
         the consultant appointed for setting up of that plant so that  engineer along with the cost certificate of each machine.
         at the later stage it may be possible that the plant is not
                                                              Government Approvals and Clearance: For setting up of a
         successful at all due to some technical fault. We have studied  unit various government approvals and clearances are
         the agreement of the contract between the company and
                                                              required. Like non agriculture land, building plan approval
         the consultant and it is to be ensured that the consultant
                                                              etc. Besides these approvals as per manufacturing method
         will help till the final product is produced. Like in paper plant  and effluent generated during the manufacturing pollution
         when due to some alignment problem in the machineries
         the product is not produced as per required specifications  control board permission is required. Pollution control board
         then setting up whole the plant and machineries will be of  first gives permission consent to establish and afterwards
         no use or it may lead to cost run and time over run.  looks into the quantity and quality of effluent generated and
                                                              method for its disposal, the consent to operate is given.
         Plant and Machineries: The product manufacturing is  Sometimes environmental clearance, forest department,


            BANKING FINANCE |                                                                APRIL | 2022 | 45
   40   41   42   43   44   45   46   47   48   49   50