CONSTRUCTION METHODOLOGY
INTRODUCTION 1.4 PROPOSED WORKS
The proposed works require the
*Refer to Appendix B for Boss construction of:
Projects Group Program of Works
1. Installation of operable floor& Alterations
in Auditorium and services upgrades to
1.1 PURPOSE Auditorium.
2. Alterations to layout and services in
This Project & Construction Methodology Science block & installation of External
Plan has been documented to describe steel framed deck
how the Project Management team shall 3. Installation of externally mounted steel
implement and conduct its allocated site façade.
management responsibilities during the
Construction phase of the Merici College This type of construction will have three
Project (the Project). distinct phases that will require different
material handling strategies to
A fundamental aim of this Plan is to optimise the construction works and
ensure all construction is properly minimise impact to surrounding streets,
facilitated, integrated and coordinated so other stakeholders, students and
as to deliver certainty to the objectives of neighbours. Our material handling
the Project. strategies and Construction planning will
This plan forms part of BOSS Projects require consultation with stakeholders and
Group Management System. authorities before implementation.
1.2 SCOPE OF THIS PLAN 1.5 PRECEDENCE
This Plan provides a holistic approach Where ambiguity is detected between the
that advises how the project management procedures and requirements in the
team will comply with the requirements of Architectural, Services and Structural
the contract relating to construction and; drawings and Specifications developed for
Defines the project objectives and the project, then the procedures nominated
targets of particular relevance to the in this plan will take precedence.
construction phase;
Describes constraints specific to the 1.6 INTERFACE WITH OTHER
construction phase and the project in PROJECT PLANS & PROCEDURES
general;
Describes the process for the The Construction Management Plan forms
identification and control of risks part of an integrated set of Project
specific to the construction phase; and Management Plans and should be
Details the proposed strategy for the read in conjunction with these other plans.
construction phase, with particular
regard to establishment resourcing, 1.7 DOCUMENT CONTROL
Site organisation and construction Amendments to this Management Plan are
controls. approved by the Project Manager and
authorised for distribution to all
1.3 SITE LOCATION holders of controlled copies.
The proposed development site is: Merici
College, 10 Wise Street, Braddon.