Page 257 - Villas at Savona Close-out Manual
P. 257
site. Water and waste grout resulting from cleaning of the mixer and/or pump shall be promptly
collected and disposed of. Water shall not be allowed to pond in the work area.
B. Site Cleanup. Upon completion of the work, all waste shall be removed from the site and the site
shall be left in a “broom-clean” condition. Any remnants of drilling fluid or grout that have
splattered on improvements shall be completely removed. Where suitable removal is not
practicable, the affected areas shall be recoated or replaced to the satisfaction of the engineer.
++ END OF SECTION ++
9
HEERUP ENGINEERING, PC January 16
Villas at Savona 03229