Page 257 - Villas at Savona Close-out Manual
P. 257

site. Water and waste grout resulting from cleaning of the mixer and/or pump shall be promptly
                      collected and disposed of. Water shall not be allowed to pond in the work area.


                  B.  Site Cleanup. Upon completion of the work, all waste shall be removed from the site and the site
                      shall be left in a  “broom-clean” condition.  Any remnants of drilling  fluid or grout that have
                      splattered on improvements  shall be completely removed.  Where suitable removal  is not
                      practicable, the affected areas shall be recoated or replaced to the satisfaction of the engineer.


                                                  ++ END OF SECTION ++

































































                                                              9
               HEERUP ENGINEERING, PC                                                               January 16
               Villas at Savona                                                                         03229
   252   253   254   255   256   257   258   259   260   261   262