Page 265 - Villas at Savona Close-out Manual
P. 265
AUTHORIZATION TO PROCEED
Proposal No. __PA15-11-04__________
Proposal Date: ___November 20_____________________, 2015__
Client name: ___Heerup Engineering, PC________________________________
Project Start date: _____November 30, 2015____________________________________
Project No. ____TBD______________________________________________________
This Authorization to Proceed confirms acceptance of the Proposal, dated __11/20/2015_______
and the contractual terms and conditions referenced therein.
______________________________________ _____________________________
On behalf of Client or Authorized Signature Date
Accepted by Amec Foster Wheeler Environment & Infrastructure,
a division of Amec Foster Wheeler Americas Limited:
_________________________________________ _____________________________
Authorized Signature Date
1-2015