               2.0    QUALITY ASSURANCE


               1.       The Distributor or Manufacture reserves the right to perform inspections on the
                          existing conditions, surface preparation, coating application, material storage and
                          any other specifications outlined in this document.


               2.1     MANUFACTURER’S FIELD SERVICES

               1.      When specified or requested, require manufacturer or supplier to have qualified
                          personnel provide a letter confirming the following:

               A.      Observation of field conditions, prior to coating application and review of
                          Construction documents for conformance with the specified manufacturers
                          warrantable systems.

               B.      Provide recommendations to make material and/or application changes
                          necessary to meet requirements for the specified warranty.



               3.0   DELIVERY, STORAGE & HANDLING

               Applicator shall take all precautions necessary and provide all equipment,
               materials and labor to adequately protect any affected project building and its
                       contents from inclement weather during construction.

                       A.     Material storage shall be in well-ventilated trailers. Trailers shall be
                              suitable for the storage of flammable substances when required, such as
                              adhesives or solvents.

                       B.     Store all materials as recommended by the manufacturer.



               4.0      WEATHER PROTECTION

                   1.Weather protection shall mean the temporary protection of that work adversely
                       affected by moisture, wind, heat and cold by covering, patching, sealing,
                       enclosing, ventilating, cooling and/or heating. This protection shall be provided
                       for all work areas, the building and its contents and all construction materials and