Page 13 - AZ - City of Tucson Fire Station 8 Rebuild
P. 13

SOQ No. 202496                              CITY OF TUCSON                                             Tab A


        for both site and public protection   Job Site Identification:              Noise Control:
        issues will be conducted by our on-site   CORE’s contractual language with   CORE recognizes that construction
        project team.                        our subcontractors mandates that all   work may be loud and disruptive for
        Our superintendents use Predictive   workers be properly  badged,  and that   residents in the area. Proactive planning
        Solutions Safety software (Illustrated   they are not to wander outside the   with the team is the only way to mitigate
        on the previous page) which allows us   construction limits.                these issues. We will present a three-
        to identify potential hazards on site, and                                  week look-ahead schedule at each team
        ultimately prevent workplace injuries.                                      meeting to determine the best time,
        Predictive Solutions is installed on   Leaning on Lessons Learned:          down to the hour, to perform louder
        superintendents’ phones to evaluate   From a long list of municipal projects   activities, as well as when to schedule
        and report on safety conditions. These   nestled into tight neighborhoods, CORE   delivery times and hoisting activities
        reports are directed to our Local and   understands  that the success  of the   that might impact the neighborhood.
        National Safety Departments so issues   project will depend significantly on
        can be addressed internally or with   the  perfect balance  of interaction  and
        our subcontractors in an expeditious   communication with the surrounding
        manner.                              community.  It is rare that all parties
                                             will be satisfied with every decision
        NOTE:                                made by the project team.  However,
        All CORE superintendents are OSHA    CORE will bring to bear every
        30 Hour Certified and have had       department in our office, from Virtual
        ample amounts of training in safe    Construction to Operations, in order to
        construction practices. A secure     best communicate with the community.
        construction site is a top priority for
        CORE. We are prepared to implement   Neighborhood Update Meetings:
        the following items:                 We propose having neighborhood
                                             update meetings start at the design
        •   Single point of entry/exit       phase, and continue as needed, through   covid-19:
                                                                                    With the outbreak of COVID-19, safety
        •   Designated parking area for      the end of the project.  CORE will     has and always will be our #1 priority.
            construction personnel           provide virtual  construction models,   To ensure the safety of our team and
        •   Screened fencing                 virtual walk-throughs as well as       your site, we have put additional safety
        •   Visitor check-in at CORE’s job   schedule and phasing diagrams.         measures in place including COVID-19
            site trailer                                                            signage, educational  training, and
        •   Fingerprints for all workers     Door Hangers:                          preventative measures. We will identify
                                             Our operations team will be intentional   all potential risks prior to beginning
        Construction Site Safety             about being a good  neighbor.  CORE,   construction  and develop  a plan with
        CORE has more than 38 years of       with the consent of the City, will be very   suppliers and subcontractors to mitigate
        experience working on active sites. The   proactive in making sure the immediate   any potential risks well in advance to
        safety of the community, surrounding   neighbors surrounding the construction   ensure  there  is  no  delay  in  schedule.
        residents, and  City of Tucson Fire   site are aware of certain construction   Should an unusual circumstance arise,
        Department staff is the most important   activities.                        CORE has a plan of action to follow for
        aspect of this project to CORE. We will                                     COVID-19.
        ensure that we have communicated
        our plan to the City and surrounding
        residents, and then execute that
        plan so that all wayward signage
        and  temporary fencing  is  in place  to
        separate construction from everyday
        life. We will coordinate construction
        laydown, traffic, and materials so that
        there is no interruption.