Page 18 - TRD
P. 18

FIG: Replacement of jumpers

                Replacement of worn-out contact wire:

                 In BPA jurisdiction between the locations  241/22-242/25,  the 960 mts of worn-
                 out contact wire (one TL) has been replaced, due to dia of the contact wire
                 reduced to 8.25 mm.  As per railway board norm it should be more than 8.25
                 mm.













                                                             Fig: Replacement of  contact wire


                Provision of long creeping composite insulators:
                 Long creep age composite insulators were provided in stone pelting areas in
                 bonakallu  (BKL)  section  and  polluted  areas  in  Sanath  Nagar  section  in  the

                 division  to  avoid  the  breakage  of  insulators  and  CB  trippings.  31  no’s  Long
                 creepage composite insulators are replaced








                                    Fig: Repalcement Of Composite insulators

                Provision of Sigma Boards ahead of STOP Signals:

                 To  assist  Loco  pilots  for  easily  identifying
                 the  STOP  signals  during  foggy  weather
                 conditions, Division has taken up the work
                 of  provision  of  Retro  reflective  SIGMA
                 boards, ahead of the STOP signals.
   13   14   15   16   17   18   19   20   21   22   23