Fig: Replacement of rusted ACC
             Replacement of Rusted cantilevers:


                 Rusted cantilevers are the one of the causes for breakdowns in polluted areas.
                 Due  to  the  rusting  of  the  rusting  of  the  cantilever  tubes,  the  mechanical
                 strength of the cantilever will decreases drastically and leads to breakdown of
                 OHE. To avert the failures due to rusting of cantilevers, replacement work has
                 taken up and replaced 911 No’s in pollution prone areas.










                                               Fig: Rusted cantilever and replacement.

             Adjustment of contact wire height @ RD-6 in SC yard:

                 To facilitate the provision for running of over dimentioned consignment (ODC),
                 the contact wire height at road-6 in SC was incresed from 5 mts to 5.46 mts. as
                 the existing- less height  FOB was dismatled by engineering department.













                                            Fig: Height adjustment work.

             Replacement of Isolators and Jumpers:


                 As  per  the  Railway  Board  and  Headquarters  guide  lines,  all  the  800  Amps
                 Isolators  and Isolator jumpers in the Main line should replace with 1250 Amps
                 and  160  Sq.  mm  Jumpers  respectively  for  increasing  the  section  speed
                 between BPQ-KI to 160 KMPH.