Page 59 - SIM Guide to annual assessment_v2.0_Dec 2021
P. 59
Roofs
Preliminary considerations.
LOAD LIMITS, CONSTRUCTION ERRORS AND MODIFICATIONS
VERIFY:
▪ Load capacity. Is it known? Has it been communicated (inventory, signage)?
▪ Errors in construction. Correct spacing of trestles or supporting beams?
▪ Materials used as per design. Type of material, thickness, fixation, sealant,
waterproofing, support structure,..)
▪ Additions and/or modifications. Were they controlled and documented?
IMPORTANT:
▪ Do not allow overloads caused by dust or other materials accumulated on your roofs.
▪ Critical Controls must be in place:
○ Load capacity limits are known and respected
○ Document structural changes/modifications
PREPARING FOR SAFE ASSESSMENT
CONSIDER:
▪ Can be avoided going on top? (Consider use of
drone)
▪ Safe access means available and ready?
(Staircase, ladders, MEWP)
▪ Safe pathways defined and marked on top?
(Assess the support structure of the pathways
from underneath)
▪ Fall prevention / protection ready? (edge
protection, lifelines, anchor points - if required)
59