Page 126 - GM E-BOOKLET 2022
P. 126

Scaling up of Crack Trains:
                        Crack paths have been identified and crack trains are being
                          run in crack paths

                        Number of Cracks run up to OCT:
                             Year           No of Cracks run  Average/day
                             2021-22                4134                  19.3
                             2022-23                5127                  23.9


                        Crack Crew LR status
                                Depot         Total Crew Available  Crew LR given
                                  SNF                     272                CT-KZJ – 120
                                Depot         Total Crew Available  Crew LR given

                                  SNF                     272                SNF- DKJ- 4+1
                                                                             KZJ-BPQ -72
                                  KZJ                     161
                                                                             BPQ-SNF - 32



                       Easing out constraints in WADI interchange in coordination with
                       SUR   division to improve sectional speed:
                        SC  crew  working  till  ACC/WADI  and  vice  versa  there  by

                          decongesting SC-WADI section. This enabled smoother WADI-
                          SUH interchange.
                        Average speed of SC – WADI Section and average handing
                          over detention at WADI
                                    Month           Avg. Speed  Detention

                                    Jul                   10.36              02:00
                                    Aug                   11.56              02:23
                                    SEP                   11.47              02:20
                                    Oct                   13.76              01:46


                       Crew links review


                        Coaching crew links are revised enabling a reduction of 16
                          men requirement for express trains and resultant relief in crew
                          for goods operations.

                        By  reviewing  guard’s  link  a  net  reduction  of  34  guards  was
                          achieved.


                       GLP Check in 45 minutes:

                        GLP  Check  by  LP  &  TM  should  be  completed  within  45
                          minutes.
                        In  OCT-22,  220  GLP  checks  are  done  at  an  average  of  31
                          minutes


                                                           124
   121   122   123   124   125   126   127   128   129   130   131