Page 129 - GM E-BOOKLET 2022
P. 129
b) In DKJ-BDCR doubling works:
JVRB-Sathupalli line to be connected to BTPD, Rail over Rail at
Dornakal by construction department.
Status: divisional observation made on conceptual plans of
proposed doubling and submitted to Dy.CE.C-III/SC.
c) TXR facility At CT:
Development of TXR facility at CT to avoid empty running to
and from SNF to MQR area
Status: Tenders finalized, LOA issued and ESP under
preparations
d) Locally operated Motor points:
Replacement of Manually operated points with locally
operated motor points at SNF yard to ensure safety and to
avoid time loss for clamping and padlocking.
Electrification of Vasavadatta Cement siding (VCSG)/ Seram:
Electrification works on the lead line and in plant was
completed in 2013. Charging could not be done due to
objection from local public. This causing delay in operations
and forced to operate diesel traction in underwire territory.
Provision of individual OHE isolators:
Provision of Individual OHE isolators for each line at 111 stations
to facilitate traffic movement over other lines.
Proposal for extension of trains:
Proposal for extension of trains to ease congestion at TDU and
CT stations with existing lie-over period
Train No. 17664/17663 (NED-TDU-PBN) Express to RC/MALM
Train No. 07659/07660 (SC-CT-SC) MEMU to KLBG
127