Page 132 - GM E-BOOKLET 2022
P. 132
5. MECHANICAL (C&W)
1. System Improvements :
i. Reduction in embedded wagons in BOXN rakes and additional
earnings: In-situ attention of unloadable wagons at 12 major
loading sidings has resulted in reduction of rejections of wagons
to bare minimum. The details of repaired wagons are as under:
No. of wagons Wagons Anticipated
No. of Rakes
Year attended in attended per earnings one day
loaded
sidings Month utilization *
2020-21 8109 37168 3097 ₹ 110 crores
2021-22 12486 45423 3785 ₹ 133 crores
2022-23
(Apr-Oct) 6169 26789 3827 ₹ 78 crores
* Cost of detention of wagon per hour is ₹1233 (Cost Circular No. 01 of 2021)
This has resulted in additional earnings for one day utilisation of
these repaired wagons and also in increased availability of
wagons for traffic use, which otherwise were running as
unloadables.
Attention of wagons at sidings
ii. Retro fitment of Twin pipe air brake system on wagons:
Target
Depot Achievement
(No. of wagons)
RDM 2103 (BOXN-1618, BOBRN-485)
2400
BPA 174 (BOXN)
SNF 200 200 (BLC)
130