Page 154 - GM E-BOOKLET 2022
P. 154
Details of Electronic In-motion weigh bridges (Railway owned):
Officer level Integratio
S. Stampin Commis CCTV
No. Station Firm g due Annual sioned n with Cameras
inspection due FOIS
1 KZJ DWS 19.07.23 18.10.23 14.08.18 03.07.19 Available
2 MAGH Merit 23.08.23 08.12.22 18.09.18 08.07.19 Available
3 TNGM DWS 11.11.22 17.07.23 27.11.17 02.07.19 Available
4 CHZ DWS 18.10.23 28.08.23 24.01.15 13.12.19 Available
5 SKP DWS 26.09.23 27.10.23 08.05.15 13.12.19 Available
6 STBD * Essae 30.10.23 30.10.23 31.10.22 16.11.19 Available
7 HSP Essae 15.06.23 17.07.23 13.06.20 07.08.20 Available
8 SUH DWS 28.12.22 13.10.23 29.01.20 19.03.20 Available
Not
9 SC Essae 26.01.23 28.08.23 23.01.21 Available
required
Not
10 HYB Essae 13.09.23 28.08.23 17.09.20 Available
required
11 MTPI Essae 12.10.23 13.10.23 04.11.22 12.10.22 Available
x. Tipplers:
Make & Year of No. of Inspection Rem
S.No Location
commissioning Tipplers due date arks
KTPS/BDCR
1 Elecon/1996 2 25.04.23 -
5 & 6 Stage
th
th
KTPS/BDCR
2 TRF/2019 2 25.04.23 -
7 stage
th
My Home India
3 Elecon/2011 1 09.04.23 -
Ltd/MACU
Ramco
4 Elecon/2000 1 09.04.23 -
Cements/JPTN
5 NTPC/RDM L&T/1994 2 21.01.23 -
MSPGCL/PRLI
6 Elecon/2007 2 27.01.23 -
6 & 7
th
th
7 MSPGCL/PRLI Elecon/2018 2 27.01.23 -
152