Page 155 - GM E-BOOKLET 2022
P. 155
Unit-8
Make & Year of No. of Inspection Rem
S.No Location
commissioning Tipplers due date arks
India Cement
8 Elecon/2011 1 27.01.23 -
Ltd(ICL)/PRLI
ORIENT
9 FLSmidth/2020 1 06.04.23 -
CEMENTS/CT
L&T/2014,
10 UTCM/MQR 2 06.04.23 -
Elecon/1992
11 Vasavadatta/SEM L&T/2009 & 1996 2 06.04.23 -
12 KBCT/TDU Elecon/2013 1 06.04.23 -
13 CCI/TDU Elecon/1986 1 12.04.23 -
Chettinad
14 Elecon/2019 1 12.04.23 -
Cements/TDU
Penna
15 Elecon/2017 1 12.04.23 -
Cements/TDU
Total 22
Periodical joint inspection of wagon suppliers by Mechanical officers
& siding authorities (once in 12 months) is being ensured.
xi. Online Monitoring of Rolling Stock (OMRS):
Present:
Online Monitoring of Rolling Stock (OMRS) was installed and
commissioned by M/s RT Vision technologies, Noida, Delhi (Indian
Agent of M/s Track IQ, Australia) at LC gate no 75 near SKZR
station between km no 206/30-28 on the Dn Main line in BPQ-WL
section on 29.01.2021, through work order issued by COFMOW.
This is used to identify following defects on Rolling stock
(Coaching, Freight & Locomotives) during run:
Bearing defects through Rail Bearing Acoustic Monitor (Rail
BAM) by comparing the preloaded sounds of defective
bearings.
Wheel defects through Wheel Condition Monitor (WCM) by
measuring wheel impact load on Rail.
Whenever any alert (Rail BAM/WCM) is generated in OMRS, a
message will be received by C&W Control/SC. SSE/Control/SC,
153