Page 156 - GM E-BOOKLET 2022
P. 156
SSE/BPA, ADME/RDM, CDO/SC, SSE/HYB, SSE/Freight, and
Engineering Control/SC.
Proposed:
LOA has been issued by COFMOW on 15.02.2022 for installation of
4 additional OMRS systems in Secunderabad division. The details of
proposed locations are as under:
S. No. Section Direction Location
1 KZJ-SC UP line Bibinagar (BN) - Ghatkesar (GT)
Raghunathpalli (RGP) - Ippa guda
2 SC-KZJ DN line
(IPG)
3 WD-SC DN line Vikarabad (VKB) - Chitgidda (CTF)
4 WL-BPQ UP line Kolnur (KOLR) - Peddapalli (PDPL)
Firm details:
M/s Wabtec Control System Pvt. Ltd.,
Unit 1, 2-8 South Street, Rydamiere, New South Wales NSW 2116,
Australia.
Indian Agent:
M/s Faiveley Transport Rail Technologies India Pvt. Ltd.,
Harita, Hosur, Tamilnadu-635109.
b) Performance Statistics:
General:
S. Target Actuals
No Item 2022-23
. 2020-21 2021-22 (Apr-Oct)
Ineffective % of AC
coaches 2.0 % 1.24 1.37 1.71
1.
Ineffective % of Non -
AC coaches 1.5 % 0.49 0.68 0.85
Coach detachments
2. 3/year 2 2 3
(Ownership)
3. Freight - Ineffective % 1.5 % 0.69 0.95 0.90
4. Wagon detachments 14/year 24 15 18
5. C&W Other Failures 57/year 79 60 39
154