Page 304 - GM E-BOOKLET 2022
P. 304

⮚  Member Electrical Inspected shed on 25/11/2004


               ⮚  Commissioning of Heavy Lifting bay on 31/3/2007

               ⮚  Commissioning of ML and LL bays on 01/03/2008

               ⮚  Achieved the zonal best Efficiency shield in 2009-2010,2021-22


               ⮚  Achieved the zonal best Efficiency shield in 2013-14 (sharing with
                   BZA)

               ⮚  Received First prize of National Energy conservation awards 2016 for

                   conservation of Energy in Railway workshop sector.

               ⮚  ELS/KZJ  achieved  5S  Certificate  and  IMS  Certificates  by  IRCLASS
                   Systems and Solutions Pvt. Ltd

               ⮚  Achieved  Energy  Management  Certificate  ENMS  ISO  50001:2011
                   from M/S Bureau Veritas (India) Pvt. ltd.
               ⮚  Achieved Green Co-SILVER certificate from CII-GODREJ GBC
               ⮚  ELS/KZJ achieved Lean six sigma certification
               ⮚  Commissioning  of  new  WAG-9    locos  in  21-22  :50  locos,  22-23  :  35

                   locos
               ⮚  ELS/KZJ has been declared as 1  scrap free shed among SCRly sheds
                                                              st

            ELECTRIC LOCO SHED KAZIPET LAYOUT







































                                                             302
   299   300   301   302   303   304   305   306   307   308   309