a.  Transmisi                                  a.  Transmission                                Performance Highlights  Ikhtisar Kinerja
                        1.  Penggantian distance relay menjadi Diffrential   1.  Change the distance relay to Diffrential Line
                           Line Relay (Pekerjaan selesai)                 Relay (Work completed)
                        2.  Perbaikan nilai tahanan pentanahan kaki    2.  Improved grounding resistance of 150 kV
                           tower transmisi 150 kV (Selesai 99 Tower)      transmission tower legs (Finished 99 Towers)
                        3.  Melakukan perbaikan dan penggantian        3.  Perform repair and replacement of
                           peralatan transmisi (Pekerjaan selesai)        transmission equipment (Work completed)
                        4.  Pengadaan Isolator tower transmisi 150 kV   4.  Procurement of 150 kV transmission tower
                           (Selesai pada Agustus 2019)                    isolators (Completed in August 2019)
                        5.  Melakukan pengamanan tapak  Tower          5.  Safeguard the 150 kV Transmission Tower   Report to Shareholder and Stakeholder
                           Transmisi 150 kV (Selesai 30 Tower)            site (30 Towers Completed)
                        6.  Melakukan penggantian / peremajaan         6.  Performing replacement / rejuvenation of   Laporan Kepada Pemegang Saham & Pemangku Kepentingan
                           sub-komponen (primary junction) berkarat       rusted sub-component (primary junction)
                           Tower SUTT Tersebar 150 kV (Proses Kajian      Tower SUTT 150 kV (Engineer Study Process)
                           Engineer)
                        7.  Menambah peralatan alat uji transmisi      7.  Adding transmission test equipment (Work
                           (Pekerjaan selesai)                            completed)
                        8.  Peningkatan kompetensi SDM Pemeliharan     8.  Enhancing the competencies of maintaining
                           Transmisi (1. Pelatihan penggunaan drone       Transmission HR (1. Training in the use of
                           sudah selesai dan  drone sudah dapat           drones has been completed and the drones
                           difungsikan, 2. Pelatihan SAS Operator GI)     can be used, 2. Training SAS SAS Operators)
                        9.  Melanjutkan pemangkasan pohon dibawah      9.  Continue trimming trees under the transmission
                           jalur transmisi secara rutin (Selesai 69       line regularly (Completed 69 goal, 117 trunks)  Company Profile  Profil Perusahaan
                           gawang, 117 batang)
                        10. Melakukan pengamanan yang lebih intensif   10. Conduct more intensive security of the
                           terhadap peralatan transmisi melalui           transmission equipment through tower fencing
                           pemagaran tapak tower (Selesai 30 Tower)       (Completion of 30 towers)
                        11. Penambahan proteksi eksternal pada         11. Adding external protection to 20 transmission
                           20 titik tower transmisi dan pengecekan        tower points and checking the transmission   Business Support Review
                           sistem grounding transmisi pada 80 titik       grounding system at 80 points (Adding external   Tinjauan Pendukung Bisnis
                           (Penambahan proteksi eksternal sudah 51        protection has 51 towers and 99 transmission
                           Tower dan perbaikan grounding transmisi        tower grounding improvements)
                           sebanyak 99 tower)
                        12. Re-Route tower transmisi 150 kV T26/T31    12. Re-Route transmission tower 150 kV T26 /
                           Jalur Baloi-Tj Sengkuang (Proses pekerjaan),   T31 Baloi-Tj Sengkuang Line (Work process),
                           Re-route Tower Transmisi Panaran - Muka        Re-route Transmission Tower Panaran - Yellow
                           Kuning dan supervisi pelaksanaannya (Proses    Face and supervision of its implementation
                           pekerjaan), Re-route Tower Transmisi T39       (Work process), Re-route Transmission    Management Discussion & Analysis  Analisa & Pembahasan Manajemen
                           s/d T46 Jalur Panaran -  Phi Connection        Tower T39 to T46 Line Panaran - Phi
                           Sagulung dan supervisi pelaksanaannya          Connection Sagulung and supervision of its
                           (Proses pekerjaan)                             implementation (Work process)

                     b.  Gardu Induk                                b.  Main Station
                        1.  Melakukan uprating Trafo dan Kabel Incoming   1.  Uprating the 20 kV Transformer and Incoming
                           Trafo 20 kV dari 30 MVA ke 60 MVA (Proses      Cable from 30 MVA to 60 MVA (Corporate
                           Pengadaan Korporat)                            Procurement Process)
                        2.  Penggantian Peralatan 150 kV GI (CB, DS,   2.  Equipment Replacement 150 kV GI (CB, DS,   Tata Kelola Perusahaan
                           CT, LA dan MK) (Pekerjaan selesai)             CT, LA and MK) (Work completed)          Good Corporate Governance
                        3.  Pemeliharaan GI secara periodik di tahun   3.  Periodic maintenance of GIs in 2019 (100%
                           2019 (100% selesai pada Desember 2019)         finished on December 2019)
                        4.  Melakukan Retrofit pada kubikel 20 kV di   4.  Retrofitting 20 kV cubicles in the GI (Finished)
                           GI (Selesai)
                        5.  Melengkapi peralatan alat uji GI (Selesai)   5.  Equipping GI test equipment (Finished)
                        6.  Meningkatkan kompetensi SDM O&M Gardu      6.  Improving the competence of the substation
                           Induk (Sudah selesai dilaksanakan diklat       O&M Substation HR (the training for learning   Risk Management
                           pembelajaran Pemeliharaan Gardu Induk          Main Station Maintenance has been completed   Manajemen Risiko
                           tanggal 14 - 18 Oktober 2019)                  on October 14-18, 2019 )
                        7.  Pengujian dan perbaikan pentanahan         7.  Testing and repairing grounding of the
                           peralatan Gardu Induk (Pengujian terealisasi   substation equipment (100% realized testing
                           100% dan perbaikan pentanahan proses           and grounding repairing the engineer review
                           kajian engineer)                               process)

                     Sampai dengan Triwulan IV tahun 2019 tidak ada   Up to Quarter IV of 2019 there were no significant
                     gangguan Transmisi dan Gardu Induk 150/20 kV   transmissions and 150/20 kV substations, nor were   Corporate Social Responsibility  Tanggung Jawab Sosial Perusahaan
                     yang signifikan, juga tidak ada gangguan akibat   there any disturbances due to suboptimal protection
                     fungsi proteksi tidak optimal, maupun gangguan yang   functions, or disruptions from the Bintan system that