Page 5 - 2020 Altiora Vol 72
P. 5

|  5
         THE JOHN CUNNINGHAM STUDENT CENTRE
         THE JOHN CUNNINGHAM STUDENT CENTRE                                                                    |  5
                                                  The Headmaster and School Board are excited and proud to announce
                                                  the School’s plans to redevelop the Stratford Building into a purpose-
                                                  built Student Centre. The construction will take place in the second
                                                  half of 2021 and require the renovation and extension of the Stratford
                                                  Building. The design is still in draft form; it is anticipated to cost
                                                  $800,000 and will be the largest building project undertaken at our
                                                  School since the Performing Arts Centre was opened in 2012. It will
                                                  ensure that the School can continue to offer superb facilities to our
                                                  students for generations to come.

                                                  As Stratford is in the centre of the Senior School campus and our
                                                  students are at the heart and soul of our School, it is a natural location
                                                  to create a student-focused facility. Our new Student Centre will serve
                                                  as a warm and dry casual hub for students to use during study lessons,
                                                  lesson breaks and meal breaks. It will include specialist study areas and
                                                  breakout rooms. It will also house all Senior School student services
                                                  including Student Reception and sick bay and spaces where students can
                                                  meet with counsellors, pastoral staff and Learning Enrichment educators.
                                                  This project has been made possible by the philanthropy of Mr John
                                                  Cunningham, a generous benefactor and Blue Mountains Grammar
                                                  School alumnus. For this reason, the facility will be named the John
                                                  Cunningham Student Centre. Whilst Mr Cunningham’s generosity
                                                  has secured the construction of the building, we will rely on additional
                                                  donations to ensure the building is all that we hope it will be. Fortunately,
                                                  in 2020, Mr Cunningham pledged to match all donations to our Building
                                                  Fund and any donations specifically for this project. With the pressures
                                                  of COVID abating, in 2021, the School’s Foundation Committee plans
                                                  to take advantage of Mr Cunningham’s generosity. On our School’s
                                                  next Foundation Day, not only will we celebrate the School’s foundation
                                                  and our long and rich history, but the Foundation Committee will host
                                                  an exciting School community fundraising event. All funds raised will
                                                  contribute to the fit-out, including internal fittings and plantings, tables
                                                  and chairs, soft furnishings and technology.
                                                  Every current student, current or past member of staff, parents of
                                                  current or past students and those who once attended this wonderful
                                                  School knows how much we need a space dedicated to the heart and soul
                                                  of our school, our students. Please support our Giving Day on Foundation
                                                        th
                                                  Day, 5  May 2021. This event will be livestreamed from the School and
                                                  networked on all school social media platforms.
                                                  More information on construction plans will be made available as they
                                                  are developed and more information on the Foundation (Giving) Day will
                                                  be forwarded from the Foundation Committee early in 2021.
                                                  ** Please note that all images shown here are conceptual drawings only.
   1   2   3   4   5   6   7   8   9   10