KPI 4 | DELIVERY



               SUSTAINABLE DESIGN

               The Karingani Design & Sustainability Guidelines were used throughout the design process to guide decisions
               making.

               Instrumental in this process was a digital thermal modeling exercise conducted to achieve an energy-efficient
               building shell and understand if the building can operate comfortably without mechanical cooling equipment,
               thereby reducing power consumption, capital costs and ongoing operational costs.

               The results informed the design and material decisions including building orientation, glazing specification, glazing
               extent, insulation and passive ventilation strategies.
               As a result of this process, key design interventions included:

               •    No mechanical air conditioning

               •    Cooling tower
               •    Shading of glazed surfaces

               •    Passive ventilation


               CONSTRUCTION PROGRESS
               The construction of Xinghana Community Lodge commenced in October 2019 and is projected for completion in
               June 2021. Project completion was delayed by 9-months, primarily due to COVID-19.









































            Final stages of construction of one of the chalet guestrooms of Xinghana







            C3   |   143                                                          STRICTLY PRIV ATE AND CONFIDENTIAL
   141   142   143   144   145   146   147   148   149   150   151