SITE ESTABLISHMENT & PROTECTION
Site protection measures restricting the construction footprint.
The construction process was carefully managed to reduce environmental impact throughout the build.
Approaches included:
• All mature trees on site were protected during the construction period
• Surface water and runoff were managed and silt fences reduced sediment movement
• Construction staging and planning identified construction areas of influence, construction routes, material
storage zones, vehicle parking, material storage and waste handling areas to limit the area of influence
• Construction fencing controlled the construction footprint and reduced human / wildlife conflict.
As a result of these measures:
• No trees were lost
• No instances of major soil contamination were recorded
• No instances of groundwater contamination were recorded
• No instances of human wildlife conflict were recorded
NATURAL CAPITAL, SOCIAL IMP A CT & SUSTAINABLE DEVEL OPMENT PROGRESS REPORT 2020 C3 | 144