Page 147 - KGR 2020-21 Annual Report
P. 147

SITE ESTABLISHMENT & PROTECTION
















































            Site protection measures restricting the construction footprint.

               The construction process was carefully managed to reduce environmental impact throughout the build.
               Approaches included:
               •    All mature trees on site were protected during the construction period

               •    Surface water and runoff were managed and silt fences reduced sediment movement

               •    Construction staging and planning identified construction areas of influence, construction routes, material
                    storage zones, vehicle parking, material storage and waste handling areas to limit the area of influence
               •    Construction fencing controlled the construction footprint and reduced human / wildlife conflict.

               As a result of these measures:

               •    No trees were lost
               •    No instances of major soil contamination were recorded

               •    No instances of groundwater contamination were recorded

               •    No instances of human wildlife conflict were recorded







            NATURAL CAPITAL, SOCIAL IMP A CT & SUSTAINABLE DEVEL OPMENT PROGRESS REPORT 2020         C3   |   144
   142   143   144   145   146   147   148   149   150   151   152