                                                      ❖ A brief overview of the project
                                                          Client: Tier-1 automotive supplier supplying plastic molded
                                                          parts and seats mainly to Maruti Suzuki India Limited. The
                                                          client has 2 plants each for seats and plastics business.

                                                          Objective:  Identifying  the  opportunities  for  increasing  the
                                                          efficiency  of  Blue-collar  Manpower,  Process  Improvement
                                                          and Raw Material Optimization.

                                                          During the course of internship, I worked in both seats and
                                                          plastics division. The project was a cost optimization project
                                                          and  all  the  recommendations  had  to  be  implemented
                                                          (Strategy to Execution project). I had to study the existing
       .
                                                          businesses and suggest/implement changes with the aim of
                    AMRIT AMAN                            cutting the cost. Worked extensively on the assembly lines
                                                          and shop floor.
                      PwC INDIA

       __________________________________________
                                                      ❖ How is a normal day at the Internship?
           GENERAL INFORMATION
                                                      After reaching the plant, I used to go to the shop floor to study
          Batch: PGDIM 25                             to study the existing process (AS IS process) and collect data. At
                                                      times, study process for one assembly line could take a few days.
          BTech: Galgotia’s College of
                                                      On, other days, I used to sit on my desk at client side and analyse
                                                      the data collected data in order to conceive the To Be process,
          Engineering & Technology
                                                      even then there were short visits to the shop floor to discuss the
          Stream: Electronics                         changes  with  the  line  supervisor/in  charge.  Once  the  analysis
                                                      was done, it had to be tested at full load on the assembly line for
          Work Ex: Wipro, Ericsson                    feasibility.


     If the changes were feasible, then it had to be presented to the leadership of the client for signoff and full-
     fledged implementation.