Page 16 - type de document
P. 16

EOS          90395-A-PHY-0002-Column feet assembly & setting



                   d.  Inject the adhesive one hole at the time
                      and have a second person insert the

                      anchor bolt inside the hole. You may
                      want to pull the anchor back out from
                      time to time to make sure there is
                      enough adhesive covering its entire
                      length.  A bit of adhesive overflow when
                      the anchor is pushed all the way in may
                      be a good indication there is enough

                      adhesive in the hole.


                   e.  Repeat the process to all remaining
                      holes and when done, allow the
                      adhesive mix cure for at least one full
                      hour.


                   f.  After the hour has passed, carefully
                      clean the Nivell plate from any leftover

                      adhesive and hand-tight all 16 bolts for now.

                   g.  You have completed floor anchoring preparation for the primary side
   11   12   13   14   15   16   17   18   19   20   21