Page 15 - type de document
P. 15

EOS          90395-A-PHY-0002-Column feet assembly & setting



               11. PERMANENTLY BONDING ANCHORS TO THE CONCRETE FLOOR – PRIMARY SIDE

                   a.  If not already done, carefully remove crossbar and levelling plates (Nivell stays) as you
                      prepare to permanently set the anchors on the primary side.

                   b.  Clean all drilled holes using a blower, a vacuum cleaner and a brush to remove dust and
                      debris.  The injectable adhesive mix used to bond the anchors to the concrete will not work if
                      the holes are dusty, wet or dirty.




















                                  IMPORTANT: The adhesive mix dries very quickly. Make sure you have
                                  everything you need before starting this process. Gather the tools and
                                  materials you will need and have a second person available for help. When
                                  in doubt, follow the adhesive mix manufacturer’s instructions.


                   c.  Make sure you have the following near you:

                         I.   Injectable adhesive mix (X3)
                        II.   Adhesive applicator tool

                        III.   Blower, hammer, cleaning materials
                       IV.   Anchor bolts
   10   11   12   13   14   15   16   17   18   19   20