Page 9 - type de document
P. 9
EOS 90395-A-PHY-0002-Column feet assembly & setting
d. Once both levelling plates are in place, locate the crossbar and mount it as a bridge between
both levelling plates. You need two people for this.
e. The crossbar is ‘pin-guided’ so it snaps into position if the levelling plates are in their proper
orientation.
f. Do not be concerned with proper level between Nivells at this point.
g. Keep in mind that there is a
‘locking bolt’ on top of the crossbar
(see image to the right) which
holds the crossbar in place and
prevents the plates from moving
independently (shifting) from each
other.
h. Once the crossbar is correctly in place, begin the process of identifying all suitable holes on
each quadrant of the Nivell plate which are not in the path of any rebar, lines (as marked on
the floor). Move the position of the Nivells on both sides to clear at least 4 holes per quadrant.
Do this on both sides!
i. Try mmaintaining squareness in reference to at least one of the walls in the room and try to
match the room layout schematics as close as possible.