Page 13 - December
P. 13

METALWORKING EQUIPMENT AND TOOLS                                   METALWORKING EQUIPMENT AND TOOLS

    The stage of project preparation is the formalization of the task of conducting      It is necessary to provide for the possibility of creating focus groups within the logistics
 logistics  engineering. The  content  and  order  of  work  during  this stage  are   engineering  team,  local mini-groups for  delegating authority to team  members  to work in
 characterized by the following:  certain  areas.  The  appointment  of  leaders  of  focus  groups  and  promising  directions  for  the
 ● the goals and objectives of the project are formulated to solve the problems   implementation of the project comes from among the most professional members of the logistics
 of manufacturing high quality castings for a specific purpose. It is possible   engineering team.
 to use  the  technology  of  target  management,  which   provides  for     The next stage is the direct use of the project. The content and order of work during this
 the formulation of goals and the construction   stage are characterized by the study and analysis of the situation, the internal potential of the
 of a tree of goals: the main goal is divided into   enterprise. At this stage of project management, an integrated assessment
 sub-goals, the totality of  the implementation   of the degree of influence of the entire set of external and internal factors
 of  which ensures  the  achievement  of  the   identified during the analysis of the situation is made. Various goals, ideas,
 required overall result. Each individual subgoal   suggestions,  needs,  opportunities,  assumptions,  constraints  directly
 is broken down into subgoals. Practice shows   related to the implementation of the project, object-oriented models of
 that there should be three to five such levels of   engineering logistics intended to be used are evaluated, options for the
 fragmentation.  optimal  choice  of an information system are discussed. Matrices are
 Typically, the lower level represents a specific task to complete;  developed and filled in: functions of the enterprise
 ● the appearance of an administrative document (for example, an order for an enterprise) on   - organizational and  functional  structure  -
 the conduct of engineering logistics is initiated;  business processes. Measures are being taken
 ●  special  working  bodies  are  formed  to  manage  the  project  and  its  implementation  -  the   to diagnose  the  activities of  the  enterprise,
 managing board, the executive board.    scenarios  are  considered  and  proposals are
 The main tasks of these bodies may be:  developed to visualize the image of the future foundry complex.
 ● definition of strategic goals and objectives for the implementation of the project;        The purpose of the conceptual design and planning
 ● identification of priorities for the implementation and implementation of the project;  of  logistics engineering is to identify  the  business  goals of  the
 ●  clarification  of  information,  analytical  and  structural  and  functional  features  in  the   organization as a whole, including the enterprise, its subsidiaries
 implementation of the project as a whole for the enterprise in relation to its structural units -   (dependent) enterprises, to describe the basic technological process
 subsidiaries;                        of the enterprise. At this stage, the development of detailed plans
 ● approval of fundamental design solutions for reforming enterprise management systems;  for the organization of work within the project is being carried out.
 ● establishing control over the implementation of the project;  It is necessary to plan the main stages of the project, the timing of
 ● analysis of organizational, methodological and technological problems and making fundamental   their implementation, predict the resource costs for the implementation
 decisions on them;  of  each   stage and the cost of each stage. The logistics engineering team is approved by the
 ● determination and approval of the staff of executive managers for project implementation.  budget for project implementation, deadlines and network schedules of work at each stage.
    The governing council should include: the head of the governing council - the head of the      For the existence and stable economic position of a diversified enterprise, cooperation
 enterprise or his first deputy, members of the governing council: heads of the main divisions of   of specialists in production, trade and financial activities is necessary. Therefore, the object of
 the enterprise, heads of subsidiaries (dependent) enterprises on the topic being introduced, the   analysis is the relationship that ensures the balanced, balanced functioning of those elements
 project manager.   of a single organization. This assessment is an integral part of the entire process of continuous
    For  direct and  operational management  of  the  project,  an  executive  board  is usually   training, advanced training, professionalism of personnel, and is carried out at all stages of the
 formed, the main tasks of which may be:  activity of each member of the team of the foundry complex and the enterprise as a whole.
 ● implementation of operational planning and ongoing control over the implementation of the   Management responsibility can be divided between different organizational units and concentrated
 project;  in one manager (Fig. 1).
 ● ensuring methodological, organizational and technological unity of design solutions;     It should be noted that there may be some deviations from this scheme in the organization
 ● definition of uniform project standards (each stage of the project corresponds to a package of   of engineering logistics management, but such an organization is the most typical.
 documents and a register of tasks that need to be solved);  Engineering logistics managers have a direct impact on production functions. This organizational
 ● initiating the creation of working groups to address important substantive issues;  structure  coordinates all management  functions.  The  centralization
 ● management of working groups;  of  the management  of  the  engineering  logistics  system  creates  a
 ● introduction of control over the quality of work execution at each stage;  mechanism within the functional cooperation in the organizational
 ● preparation of messages, reports, reports, questions, formation of an agenda for meetings   structure of the foundry and the entire enterprise. This allows
 of the governing council.  you to remove many conflicts between different departments.
    The executive board  includes: the  head  of  the  executive board  (project manager  -   In addition, centralization provides certain benefits in the field
 chairman), heads of project and working groups, technical manager of project implementation.   of logistics engineering, more efficient analysis of production
 In accordance with the orders of the executive board, working groups are formed (a team to   costs. The degree of centralization depends on the product
 ensure logistics engineering) for analysis, development of methods and mechanisms for solving   mix and the market environment. The foundry engineering
 the problem, implementation of recommendations for improving the project. It seems expedient   logistics  system  interacts  with many of  the  enterprise's
 to create  a  matrix  management  structure  a  project  based  on  the  principle of  a  reasonable   management  functions,  such  as  marketing,  manufacturing,
 combination of management efficiency, the minimum number of personnel and its sufficiency   pricing, etc.
 to perform the assigned tasks. Ensure that the logistics engineering team includes employees
 from all major departments of the plant or company.
    It  is important to foresee  in advance  the  feasibility  and  procedure  for  including
 representatives of independent auditing, engineering, consulting, legal and other companies
 in the team: stages, specific types of work are determined, and deadlines are planned for the
 execution of work by the involved specialists.

 12  Stanochniy park                                                                              Stanochniy park      13
   8   9   10   11   12   13   14   15   16   17   18