Page 14 - December
P. 14

METALWORKING EQUIPMENT AND TOOLS                                                                                                                                                         METALWORKING EQUIPMENT AND TOOLS

                                                                                                                                 cycle,  the  lead  time  with high  quality  castings.                The  presence  of  a  sufficiently  good
                                                                                                                                 These processes are in a certain way correlated                imitation model of the foundry complex and
                                                                                                                                 with material support, the task of which is to fully           modern  technology  makes  it possible to
                                                                                                                                 meet the needs of the foundry. The relationship                conduct their dialogue expert assessments
                                                                                                                                 between  these  two  processes  becomes  acute                 by     introducing      certain     controversial
                                                                                                                                 when it is necessary to fulfill an urgent order or             provisions that allow one to see the inevitable
                                                                                                                                 a new type of product. In this case, the mobility,             consequences  to which it will  lead.  Using
                                                                                                                                 flexibility of the system for ensuring the process             the simulation model, one should calculate
                                                                                                                                 of  competitive  production determine  business                the  probabilistic  and improbable  causes
                                                                                                                                 success.  In  addition,  in  modern  conditions,               and  the  possibility  of defects  in castings,
                                                                                                                                 engineering  logistics is  the  main  factor  in  the          ranging from the quality of the charge to
                                                                                                                                 competitiveness  of  the  foundry,  taking into                the state and influence of the environment
                                                                                                                                 account the state of the production infrastructure             and the economic efficiency of production.
                                                                                                                                 of the entire enterprise.
                                                                                                                                        The  most  promising way to improve  the
                                                                                                                                 quality  of  cast  parts  on  the  basis  of  improving
                                                                                                                                 the technological processes of their manufacture,
                                                                                                                                 structure  and  foundry  management  systems  is
                                                                                                                                 the  development  of  a  simulation model  of  the
                                                                                                                                 foundry complex and dialogue expert evaluations
                                                                                                                                 based on it. This will allow determining the optimal
                                                                                                                                 parameters  for  achieving  high  efficiency  in  the
                                                                                                                                 operation of foundries or in the development and
                                                                                                                                 implementation of new technology.


































        Fig. 1. Approximate organization of the logistics service engineering at the enterprise during project development of foundry
        complex.



               Marketing determines the subject-assortment specialization of production, which, in turn,
        significantly affects the commercial system of engineering logistics. The larger the range of                                                                                              S. S. Tkachenko, President of the Foundry Association
        products, the more complex the problems of logistics engineering in all areas of production,                                                                                                   St. Petersburg and the Leningrad region (LenAL),
        order processing, inventory control, transportation. The nomenclature can be designed with                                                                  Honored Metallurgist of the Russian Federation, Doctor of Technical Sciences, Professor.
                                                                                                                                                                                                                                       A.A. Getman.
        product  distribution  issues  in  mind  and  ignored.  For  example,  the  modification  of  the  basic
        product model can occur when the total technological cycle is reduced as a result of the use
        of additional accessories. This approach reduces the range of raw materials and components
        required for production. However, products are often designed with marketing in mind. In most
        cases,  this  leads  to  product  modification  at  the  technological  stage  of  engineering,  without                 References:
                                                                                                                                 1. Golod V.M., Denisov V.A. Theory, computer analysis and technology of steel casting. Ed. SPGUTD, 2007.
        taking into account the effect of the influence of this event on the cost of physical distribution.                      2. Desnitskiy V.V. Computer-aided design of casting manufacturing technology. Ed. Leningrad University, 1987.
        The  management  of  the  production  process  of  the  foundry  complex  is primarily  aimed  at                        3. Desnitskiy V.V., Matveev I.A., Desnitskaya L.V. CAD for steel casting. Collection of works "Foundry production today and
        reducing production costs and, as a rule, is focused on the rhythmic work of the production                              tomorrow". Ed. Kultinform-press, 2014.


     14   Stanochniy park                                                                                                                                                                                                     Stanochniy park       15
   9   10   11   12   13   14   15   16   17   18   19