Page 15 - December
P. 15

METALWORKING EQUIPMENT AND TOOLS                                   METALWORKING EQUIPMENT AND TOOLS

    cycle,  the  lead  time  with high  quality  castings.                 The  presence  of  a  sufficiently  good
    These processes are in a certain way correlated                imitation model of the foundry complex and
    with material support, the task of which is to fully           modern  technology  makes  it possible to
    meet the needs of the foundry. The relationship                conduct their dialogue expert assessments
    between  these  two  processes  becomes  acute                 by     introducing      certain     controversial
    when it is necessary to fulfill an urgent order or             provisions that allow one to see the inevitable
    a new type of product. In this case, the mobility,             consequences  to which it will  lead.  Using
    flexibility of the system for ensuring the process             the simulation model, one should calculate
    of  competitive  production determine  business                the  probabilistic  and improbable  causes
    success.  In  addition,  in  modern  conditions,               and  the  possibility  of defects  in castings,
    engineering  logistics is  the  main  factor  in  the          ranging from the quality of the charge to
    competitiveness  of  the  foundry,  taking into                the state and influence of the environment
    account the state of the production infrastructure             and the economic efficiency of production.
    of the entire enterprise.
            The  most  promising way to improve  the
    quality  of  cast  parts  on  the  basis  of  improving
    the technological processes of their manufacture,
    structure  and  foundry  management  systems  is
    the  development  of  a  simulation model  of  the
    foundry complex and dialogue expert evaluations
    based on it. This will allow determining the optimal
    parameters  for  achieving  high  efficiency  in  the
    operation of foundries or in the development and
    implementation of new technology.


































 Fig. 1. Approximate organization of the logistics service engineering at the enterprise during project development of foundry
 complex.



    Marketing determines the subject-assortment specialization of production, which, in turn,
 significantly affects the commercial system of engineering logistics. The larger the range of   S. S. Tkachenko, President of the Foundry Association
 products, the more complex the problems of logistics engineering in all areas of production,   St. Petersburg and the Leningrad region (LenAL),
 order processing, inventory control, transportation. The nomenclature can be designed with   Honored Metallurgist of the Russian Federation, Doctor of Technical Sciences, Professor.
                                                                                                           A.A. Getman.
 product  distribution  issues  in  mind  and  ignored.  For  example,  the  modification  of  the  basic
 product model can occur when the total technological cycle is reduced as a result of the use
 of additional accessories. This approach reduces the range of raw materials and components
 required for production. However, products are often designed with marketing in mind. In most
 cases,  this  leads  to  product  modification  at  the  technological  stage  of  engineering,  without   References:
    1. Golod V.M., Denisov V.A. Theory, computer analysis and technology of steel casting. Ed. SPGUTD, 2007.
 taking into account the effect of the influence of this event on the cost of physical distribution.  2. Desnitskiy V.V. Computer-aided design of casting manufacturing technology. Ed. Leningrad University, 1987.
 The  management  of  the  production  process  of  the  foundry  complex  is primarily  aimed  at   3. Desnitskiy V.V., Matveev I.A., Desnitskaya L.V. CAD for steel casting. Collection of works "Foundry production today and
 reducing production costs and, as a rule, is focused on the rhythmic work of the production   tomorrow". Ed. Kultinform-press, 2014.


 14  Stanochniy park                                                                              Stanochniy park      15
   10   11   12   13   14   15   16   17   18   19   20