Page 22 - KRCL ENglish
P. 22

4.3  New trafc streams originating on KR

                   •     Imported fertilizer trafc from Ratnagiri has taken shape during the year and is expected
                         to continue in future. The fertilizer trafc imported at Jaigad Port is loaded from Ratnagiri
                         station to various parts of the Maharashtra and Karnataka. During the year, 88 fertilizer
                         rakes (233512 Ton) are loaded from Ratnagiri fetching KRCL an originating earning of
                         ` 34.65 Crore.

                   •     The Petroleum Coke loading has been started from the newly commissioned MRPL
                         siding at Thokur. During the year, 24 rakes (90977 Ton) are loaded fetching KRCL an
                         originating earning of ` 16.88 Crore.

                   4.4  Overall Train Operation


                         KR is single line section of 738 kms having average block section of 13 kms. The section
                         capacity utilization is more than 100%.  Despite granting total trafc block of 16001 hours
                         for maintenance and Railway Electrication works, 18315 coaching trains and 4408
                         freight trains were run along with maintaining punctuality of 81%.

                   4.5  Improvement in services

                   •     On 26/01/2019, Computerized Unreserved Ticketing System (UTS) was implemented at
                         all stations over KRCL to bring uniformity in ticketing system over IR and KRCL. As a one
                         step  further,  mobile  ticketing  system  has  been  commissioned  on  15/01/2020  at  all
                         stations over Konkan Railway.


                   •     During the year, the new siding of M/s. Mangalore Renery and Petrochemicals served
                         by Thokur Station has been commissioned on October-2019 for the trafc. The siding is
                         equipped with conveyor belts and loading silos for petroleum coke loading operations.

                   •     The process for award of earning contract through IREPS tendering system has been
                         started rst time and total 42 tenders have been oated through IREPS during the year.

                   •     Konkan Railway has constructed Food Court at Madgaon station to serve variety of
                         eatables to the passengers. i.e. Pizza & Berger, Chinese cuisine, South Indian cuisine,
                         Indian Chat, Sandwiches, Wraps, Coffee & Bakery items, Juices & Ice-creams etc. All
                         seven  stalls  of  the  Food  Court  have  been  allotted  and  are  in  the  process  of
                         commissioning.

                   •     Complaint Management System i.e. Rail Madad has been implemented on KRCL on
                         15/07/2020. It is a one-point solution for railway commuters. 'Rail Madad' is an easy
                         solution to resolve passenger's complaints.  Complaints are being monitored 24 X 7 on
                         Rail Madad portal and resolved on real time basis. The real time redressal has helped in
                         reduction of complaints on KRCL.