Page 27 - KRCL ENglish
P. 27

bridges, 2 Road under bridges, 198 Minor bridges, more than 16 lakhs cum earthwork
                         and track linking.  A nancial progress of more than `110 Crore has been achieved in this
                         nancial year, making a cumulative nancial progress of more than ` 350 Crore.  The
                         project has recorded a physical progress of more than 94%.





















                                  (A view of Patli Bridge)                (A view of Mangaon RUB)
                   6.5  Rail connectivity to Vizhinjam International Seaport, Kerala

                         An MoU has been signed between the Corporation and Vizhinjam International Seaport
                         Ltd (VISL) to link the Vizhinjam Seaport (11 km) with Southern Railway.   The Detailed
                         Project Report (DPR) with an estimated cost of ` 1032 Crore has been submitted to VISL.
                         Southern Railway have conveyed in-principle approval of the project to VISL under 'Non-
                         Governmental Railway (NGR)' Model and asked VISL to remit the balance D&G Charges
                         for processing the DPR for approval.


                   6.6  PET Survey for new BG line between Raxaul and Kathmandu (Nepal)

                         The work of Preliminary Engineering cum Trafc (PET) Survey for new electried BG line
                         between Raxaul (India) & Kathmandu (Nepal) was awarded to KRCL.  The work of rst
                         international project of KRCL was completed in a record time of 4 months. Final Report
                         with 1 in 50 gradient was submitted to ECR and the same was approved. Subsequently,
                         Railway Board had asked KRCL to submit cost estimation to carry out Final Location
                         survey and for preparation of Detailed Project Report and the same was submitted by
                         KRCL.

                   6.7  Final Location Survey for new BG Line between Raxaul and Kathmandu:

                         East  Central  Railway  (ECR)  have  awarded  Final  Location  Survey  for  new  BG  Line
                         between Raxaul and Kathmandu. Tender process by KRCL through IREPS portal is
                         progressing.  Due  to  outbreak  of  COVID-19,  notice  of  “Force  of  Majeure”  dated
                         28.03.2020 has been conveyed to ECR.





                                                             25
   22   23   24   25   26   27   28   29   30   31   32