Page 20 - 11394_AEW_XX_XX_PP_A_0003_CO-OP PRE-CONSTRUCTION MANUAL
P. 20

1











        1B.3 TCG led project





        Stage 1








        Stage 1 encompasses all actions

        required from identification of a

        (non-marginal) new site through to Food

        Property Board [FPB] approval and is

        defined as:




             1.  The RAM identifying the site and agreeing the site with LP&P                 11.   Following RLA approval, drawing governance approval and completion
                                                                                              of zonal analysis, the External Project Manager will notify the Quantity
             2.  The RAM will produce a draft Investment Appraisal [IA] and compile the       Surveyor to produce the CV1 cost plan. This notification will include
             legal package of information, including the relevant searches. The agreed        confirmation of agreed information to date including PCSD’s 02, 03 & 04
             site will be communicated to the External Project Manager and the RAM will       completed by the External Project Manager
             confirm TCG’s brief and requirements for the location.
                                                                                              12.  Upon completion of the Cost Validation 1 [CV1] Document, the Quantity
             3.  The External Project Manager will instruct the Architect, the Quantity       Surveyor will collate the Scheme Approval 1 Pack (containing CV1, Stage 1
             Surveyor and informs the Asset team. Simultaneously, the RAM or External         feasibility drawings, scoping drawings where required, Asset Plan and zonal
             Project Manager will request existing hazardous material information for the     analysis) and issue to the External Project Manager for their approval and
             site                                                                             comments

             4.  The External Project Manager will set the project plan to establish an       13.  Once agreed the External Project Manager will submit the project
             outline programme to report against within TCG and will issue the project        for Scheme Approval 1. The Internal Project Manager, External Project
             plan to the RAM, Internal Project Manager, Quantity Surveyor, Architect and      Manager and Quantity Surveyor will be present at the Scheme Approval 1
             Format team                                                                      Meeting

             5.  The Architect will undertake a Stage 1 feasibility considering the site      14.  Should the project be rejected at Scheme Approval 1, the Stage 1
             layout including;                                                                process will be ended, and project aborted or reworked and brought back to
             •   Access and egress                                                            Scheme Approval 1 at a later time
             •   Building location and layout including BOH, FOH and external yard
                requirements, customer entrance MOE’s and delivery access                     15.  Should the project be approved at Scheme Approval 1 it is deemed fit to
             •   Customer parking, circulation and pedestrian routes                          proceed to Stage 2. During the meeting, the Quantity Surveyor will issue the
             •   Access and egress for the delivery vehicle including preliminary swept       approved Stage 1 pack and CV1 Investment Appraisal [IA] summary to the
                path analysis                                                                 RAM to obtain approval from the FPB
             •   BOH layout including freezer/chiller location, office, colleague rest area,
                bakery and WC including ventilation requirements                              16.  Following the Scheme Approval 1 meeting, the Internal Project Manager
                                                                                              will complete and issue the meeting minutes to the team (RAM, External
             6.  Following issue of the Architect’s Stage 1 feasibility, the External Project   Project Manager, Quantity Surveyor Architect and Format)
             Manager and Architect will attend site to and review the scheme proposal.
             Multiple options may be required until a preferred solution for the site is      17.  The RAM will notify the External Project Manager to proceed with Stage
             identified. This process will include liaison with TCG logistics’ team, led by   2 upon FPB approval
             the External Project Manager. The Architect will provide 360 photo data
             following the initial site visit

             7.  Once the preferred Stage 1 feasibility has been established, the External
             Project Manager will liaise with TCG’s Format team to establish an Asset
             plan. The External Project Manager will provide Pre-Construction Support
             Documents 00 & 01 to the Format team as a brief

             8.  The Format team and Architects must work in conjunction to ensure the
             Stage 1 feasibility and Asset plan are co-ordinated. For TCG led conversion
             projects only, the Architect will also produce scoping drawings at this stage
             to establish required works

             9.  Once the Stage 1 feasibility and Asset plan are co-ordinated (scoping
             drawings completed where required), the External Project Manager will
             notify the RAM to allow consultation with the RLA. Simultaneously, the
             Format team will submit the Asset plan for drawing governance approval

             10.  Following RLA approval (desktop assessment completed by RLA), the
             RAM will instruct zonal analysis to be undertaken











         1B.3   TCG led project                   Stage 1                              0.0                                   11.10.19