Page 19 - 11394_AEW_XX_XX_PP_A_0003_CO-OP PRE-CONSTRUCTION MANUAL
P. 19
RAM External PM QS Architect
Marginal site identified
Ex.PM instructs Architect
RAM instructs Ex.PM of and QS (if cost appraisal Architect undertakes
marginal site is required) to undertake Stage 0 feasibility study
Stage 0
Architect issues Stage
0 feasibility drawing to
Ex.PM & QS
Stage 0 feasibility Stage 0 feasibility
drawing received drawing received
QS develops Stage 0
cost appraisal
QS issues Stage 0 cost
appraisal to Ex.PM
IF REQUIRED
Ex.PM issues Stage
RAM receives Stage 0 0 feasibility drawing
feasibility drawing and and cost appraisal (if
cost appraisal required) to RAM to
determine site suitability
RAM undertakes draft
Investment Appraisal
[IA] to determine if site
should be put forward
to LP&P