Page 9 - 11394_AEW_XX_XX_PP_A_0003_CO-OP PRE-CONSTRUCTION MANUAL
P. 9
RAM External PM QS Architect
Marginal site identified
Ex.PM instructs Architect
RAM instructs Ex.PM of and QS (if cost appraisal Architect undertakes
marginal site is required) to undertake Stage 0 feasibility study
Stage 0
Architect issues Stage
0 feasibility drawing to
Ex.PM & QS
Stage 0 feasibility Stage 0 feasibility
drawing received drawing received
QS develops Stage 0
cost appraisal
QS issues Stage 0 cost
appraisal to Ex.PM
IF REQUIRED
Ex.PM issues Stage
RAM receives Stage 0 0 feasibility drawing
feasibility drawing and and cost appraisal (if
cost appraisal required) to RAM to
determine site suitability
RAM undertakes draft
Investment Appraisal
[IA] to determine if site
should be put forward
to LP&P