Page 12 - 11394_AEW_XX_XX_PP_A_0003_CO-OP PRE-CONSTRUCTION MANUAL
P. 12

1















        1A.4 Developer led project

        Stage 2








        Stage 2 identifies the development of

        a project post Scheme Approval to the

        point that Contracts can be exchanged.





             1.  Once approved at Scheme Approval 1 the RAM will engage solicitors            13. If the CV2 Cost Plan is higher than the CV1 Cost Plan, the External
             and agree the lease and the Internal Project Manager will appoint the            Project Manager will escalate the approved Stage 2 Pack to the RAM and
             Principal Designer on behalf of TCG                                              Internal Project Manager for a Cost Plan review

             2.  The External Project Manager will notify the project team (Architect,        14.  Should the CV2 Cost Plan be greater than +5% of that approved at CV1
             Quantity Surveyor and Format) of the projects success through Scheme             or outside of a 12 month board approval date, the project will be represented
             Approval 1 and engage with the Developer                                         at FCEF. FCEF approval is required for the project to proceed

             3.  Working collaboratively and in conjunction with each other, the External     15.  Should the CV2 Cost Plan exceed board approval >5% of the approved
             Project Manager will lead the project team through negotiation with the          CV1 costs, the project will be escalated to the Head of Acquisitions for
             Developers team until such a time that final shell drawings are agreed. The      DAL uplift. The Head of Acquisitions approval is required for the project to
             External Project Manager will also agree the Shell Specification with the        proceed
             Developers team for approval by the Internal Project Manager
                                                                                              16.  Once the project has passed Scheme Approval 2, Contracts can be
             4.  During the Shell negotiations with the Developer, the External Project       exchanged.
             Manager, Quantity Surveyor, Architect and Principal Designer will undertake
             a Design Team Meeting. DTM minutes to be issued by the External Project
             Manager following the meeting

             5.  The Architect and Format must used the final shell drawings to produce
             the Stage 2 Report and co-ordinated Asset Plan respectively

             6.  The Principal Designer will use the information from the project team and
             Developer negotiations to develop the Pre-Construction Information [PCI]

             7.  Following receipt of the final shell drawings, agreement of the
             specification, co-ordinated Stage 2 and Asset plan and the PCI, the External
             Project Manager will update the PCSD’s 01-04, complete the Acquisition
             and Pre-Construction cost summary (PCSD 05) and issue to the Quantity
             Surveyor to produce CV2 Cost Document

             8.  Upon completion of the CV2 Cost Document, the Quantity Surveyor will
             collate the package of information required for Scheme Approval 2 and
             issue to the External Project Manager for their approval and comments

             9.  Once agreed the External Project Manager will submit the project for
             Scheme Approval 2. The External Project Manager and Quantity Surveyor
             will be present at the Scheme Approval 2 Meeting

             10.  Should the project be approved at Scheme Approval 2 the Quantity
             Surveyor will issue the Approved Stage 2 Pack and CV2 Investment
             Appraisal [IA] summary to the RAM during the meeting

             11.  Following the meeting, the Internal Project Manager will complete and
             issue the meeting minutes to the team (RAM, External Project Manager,
             Quantity Surveyor, Architect, PD and Format)

             12. If the CV2 Cost Plan is under the CV1 Cost Plan, the project will
             proceed.




















         1A.4   Developer led project             Stage 2                              0.0                                   11.10.19
   7   8   9   10   11   12   13   14   15   16   17