Easing out constraints in WADI interchange in coordination with
SUR division to improve sectional speed:
SC crew working till ACC/WADI and vice versa there by
decongesting SC-WADI section. This enabled smoother WADI-
SUH interchange.
Average speed of SC – WADI Section and average handing
over detention at WADI
Month Avg. Speed Detention
Jul 10.36 02:00
Aug 11.56 02:23
SEP 11.47 02:20
Oct 13.76 01:46
Crew links review
Coaching crew links are revised enabling a reduction of 16
men requirement for express trains and resultant relief in crew
for goods operations.
By reviewing guard’s link a net reduction of 34 guards was
achieved.
GLP Check in 45 minutes:
GLP Check by LP & TM should be completed within 45
minutes.
In OCT-22, 220 GLP checks are done at an average of 31
minutes
Rolling stock speed improvements
Processing for increasing wagon speeds where JSC speeds
are less than that of wagon permitted speeds.
A total of 40 type wagons were identified and letter was sent
to Sr.DEN/CO-ord /SC to enhance the speeds over 30
sections of SC division
(Annexure Enclosed)
Increasing the speeds of 11 different track maintenance
machines to RDSO/IRTMM permitted speeds is under process
(Annexure Enclosed)