Page 19 - Evaluasi Dampak Penghentian Proses Pengadaan Barang dan Jasa DAK Bidang Jalan dan Jembatan
P. 19

Government also launched similar program, Re-gional    Ministry of Finance (MoF), Ministry of Human Affair
        Road Grant Program (RRGP) for 15 provinces/districts   (MoHA), nd Ministry of Transportation (MoT). The
        in National Tourism Destination Area.                  detail organization structure is shown in Figure 2.


        4. PRIM/PPRG                                           5. PRIM NTB PROVINCE AND LOMBOK BARAT
        PRIM/RRGP is using a different mechanism comparing     DISTRICT
        to other scheme of central govern-ment support funds to   NTB Province and Lombok Barat district are located in
        local government. PRIM/RRGP program is employing       the Lombok Island as part of the Mandalika national
        a reimburse-ment method, where local government        tourism center area. The first incentive-based program
        must do pre financing of construction work and some    was run for road maintenance of provincial road in NTB
        good governance items. Local government will get       Province started in 2013 and ended in 2019. The program
        the reimbursement and incentive of their perform       was to maintenance and rehabilitate some of around
        output based on the verification. The Verification and   1.485 km of provincial road which was only around
        reimbursement are conducted in 3 (three) stages and    60% of road in stable condition in 2012. The program
        reimbursement grant will comprise of  (i)  Incentive   was using the PRIM scheme, so the reimbursement is
        for  Good  Govern-ance-around 10%  of  physical  work   only 40% of the total budget for physical work and 10%
        budget and (ii) reimbursement of the Physical works    incentive for good government improvement. In the
        pro-gram, 40% for PRIM and 100% for RRGP.              first three year, the local government had difficulty in
        All the procedure, mechanism and guidance of the PRIM/  fol-lowing the program. It is due central government
        RRGP program are set out under the strict regulation   introduced some new governance approach such as
        within Program Management Manual (PMM). PRIM/          implementation  of  the  sustainable  programming  and
        RRGP program seeks to impose a new mindset to          budgeting through P/KRMS introduction, application
        local governments on road management, i.e. road        of long segment contract, activa-tion of RTTF and
        operators should pri-oritize routine maintenance work   public consultation, more con-cern on maintenance
        and backlogs and minor workscompared to new road       and off carriageway/road safety aspect and other output
        construc-tion and road improvements. The program       performances. But then, in the following year until the
        is in-volved not only the public work department but   end of pro-gram, the stakeholder in NTB Province
        also related local government institution such as local   became familiar with the program and the road already
        planning  agency, tourism  department, transportation   reach 84% in stable condition in 2019. NTB Province
        department, finance department and procurement unit.   is pioneer in implementing the E-catalogue for routine
        The incentive for Good Governance is con-sisting       maintenance  of  road.    Many  of  local  governments
        of many items which are  increased at every stage of   around Indonesia are interesting with the achievement
        verification process. In 2020 there is about 62 good   and conducting study/site visit to NTB.
        government items should be fulfilled by the local
        government. Since 2016, there is a deduction when an
        item is not fulfilled as the following way;              Table. 2 Contract Packaging of Corridor Management in

                                                                                Lombok Barat District
        Incentive Deduction = [1/ (number of verification items                                           Contract
        per year) * allocated incentive value per year]                       Pack-    Number    Length     Value
                                                                 No   Year             of Road
                                                                               age                (km)     (bil-lion
        In order to run and manage the program, an organization                         Link               Rupiah)
        structure is estab-lished involving several ministries.   1   2017     P1        12       56.69     15.2
        There are Ministry of Public Work and Housing            2    2017     P2        38      145.47     13.7
        (MPWH), there are three units involved (i) Center of     3    2018     P1        14       66.74     15.8
        Facili-tation for Regional Infrastructure (CFRI), Secre-  4   2018     P2        28      131.27     12.5
        tary General, (ii) Directorate General of Highway and    5    2018     P3        19       91.27     16.29
        (iii) Regional Infrastructure Development Agency,
        National Development Planning (NDP/Bappenas),

                                                                                                                  19
                                                                             BULETIN PUSAT FID EDISI 1 2020       19