Page 202 - Mines Facilities Plan
P. 202

Beck Venture Center Conceptual Illustration (Mines)




















                                                                                         THE SITE Arapahoe Street should be restored between 18th and 17th Streets as either  a vehicular or pedestrian circulation route. Sidewalks on 18th and 17th  Streets should be wide enough to accommodate students walking to/from   Jackson Hall.




                                                                                 of integrating active uses into a parking structure. Active uses could include a
                                                         parking. Additionally, the redevelopment will displaced the 452 spaces in lots
                                                                               planned parking structure at Maple Street and 14th Street is a good example
                                                 The 18th Street Research neighborhood will significantly expand the number
                                                      research goals. This redevelopment will generate the need for more vehicle
                                                                         Street, and Arapahoe Street. The garage should include non-parking active
                                                    of modern research laboratories and will enable Mines to reach its funded
                                                                   Mines should construct a 900-space, approximately 380,000 GSF parking
                                                                      structure on the block bounded by Washington Street, 18th Street, 17th

                                                                                      ces for parking/security. Enabled projects: Redevelopment of lots CTLM and I for the Research Buildings


                                          WASHINGTON/18TH PARKING STRUCTURE
                                                                                                                      









                                                                              uses on at least the ground floor on the Washington Street facade. The   new business venture center or offi Necessary precedent projects: The parking spaces in Lot J should be replaced   Colorado School of Mines Facilities Master Plan









                                              THE NEED      CTLM, I, and J.  THE PROJECT   before construction begins.  1, 2, and 3.  196
   197   198   199   200   201   202   203   204   205   206   207