Page 249 - Mines Facilities Plan
P. 249
243
STORM SEWER RECOMMENDATIONS
SOUTH SIDE OF WEST CAMPUS ROAD. INSTALL STORM SEWER AND STORM INLETS ON THE REPLACE AND UPSIZE THE STORM SEWER CROSSING THE INTRAMURAL FIELDS. INSTALL STORM SEWER AND STORM INLETS ON THE NORTH SIDE OF WEST CAMPUS ROAD. INSTALL STORM SEWER IN 18TH STREET BETWEEN ILLINOIS STREET AND WASHINGTON AVENUE. REMOVE AND REPLACE STORM SEWER IN 16TH STREET BETWEEN CHEYENNE STREET AND ARAPAHOE STREET. UPSIZE STORM SEWER IN ARAPAHOE STREET BETWEEN 16TH AND 17TH STREETS. INSTA
A B C D E F G The Plan
C
G
B
E
F
Washington Ave
3
5
D
Replace existing storm piping on the west side of West Campus 19th Street
A
1 Road. 2
REGIONAL WATER QUALITY INFRASTRUCTURE 1 QUALITY POND. 2 WATER QUALITY POND. 3 QUALITY POND. 4 WATER QUALITY POND. 5
6th Avenue MINES PARK PROPOSED REGIONAL WATER VOLUME RANGE: 9,100 CF – 13,000 CF SOUTH CAMPUS PROPOSED REGIONAL VOLUME RANGE: 10,500 CF – 14,600 CF STUDENT LIFE PROPOSED REGIONAL WATER VOLUME RANGE: 3,000 CF – 4,300 CF INNOVATION HUB PROPOSED REGIONAL VOLUME RANGE: 9,500 CF – 13,200 CF RESEARCH NEIGHBORHOOD PROPOSED REGIONAL WATER QUALITY FACILITY. VOLUME RANGE: 6,900 CF – 9,600 CF