Page 246 - Mines Facilities Plan
P. 246

New cabling will utilize the existing tunnel system and underground pathways
                                                   years old. The Network and Telecommunications teams are working towards
                                             While most of the backbone fiber to the major campus buildings is relatively








                                                                                                                      








                                          TECHNOLOGY INFRASTRUCTURE    new, there are still cables to some locations that are now approximately 20  supporting 10 Gigabit communication speeds to all major academic and  administrative buildings. This will require the replacement of multiple inter- building cables. Additionally, there are multiple buildings which require a  second fiber optic connection to ensure reliability.    to the extent possible. New connection points are yet to be
   241   242   243   244   245   246   247   248   249   250   251