Page 246 - Mines Facilities Plan
P. 246
New cabling will utilize the existing tunnel system and underground pathways
years old. The Network and Telecommunications teams are working towards
While most of the backbone fiber to the major campus buildings is relatively
TECHNOLOGY INFRASTRUCTURE new, there are still cables to some locations that are now approximately 20 supporting 10 Gigabit communication speeds to all major academic and administrative buildings. This will require the replacement of multiple inter- building cables. Additionally, there are multiple buildings which require a second fiber optic connection to ensure reliability. to the extent possible. New connection points are yet to be