Page 241 - Mines Facilities Plan
P. 241

However, it is anticipated that the cooling will be provided via a combination of
                                                                                      the ability to provide redundancy if one chiller were to go down in Chiller Plant
                                                         with the design and construction of Research 1. The reason for this is that the
                                                                                                        reside in either the Frontiers Building or as a stand-alone building on campus.
                                                                                                                      235
                                                                              redundancy and backup for the system as a part of this master plan. The new
                                                            14” chilled water supply and return pipe from Chiller Plant 6 along 18th Street
                                                                                   to house three (3) 600 ton chillers. This size was determined to give the plant
                                                                                 Chiller Plant 8 will be located within Research 3. Chiller Plant 8 is anticipated
                                                      Chiller Plant 6 and Chiller Plant 7 should be looped prior to or in conjunction
                                                                           called Chiller Plant 8 should be constructed and tied into the loop to provide
                                                                                                     There is a possibility that a High Performance Computing (HPC) Center will
                                                               would exceed the design flow limitation of 10 FPS once this building comes
                                                                                               chilled water and would be distributed with 14” chilled water mains and tied
                                                                        In addition to the Chiller Plant 6 and Chiller Plant 7 loop, a new chiller plant
                                                                                            These chillers would be capable of producing approximately 4,300 GPM of
                                               Park neighborhood. Refer to Appendix 2: Utility Master Plan for supporting
                                             provide the anticipated load for all the future buildings within the Research
                                                                                         6 (1,300 tons) and one chiller in Chiller Plant 7 (540 tons) simultaneously.
                                          Plan. It is anticipated that Chiller Plant 6 and Chiller Plant 7 will be able to
                                                                 online. Therefore, the loop is required to load share throughout the piping
                                                                                                           The requirements and demands of this center are still being developed.
                                                                                                                      The Plan



                                                                    network. Research 1 is anticipated to start design in 2023.  into the existing loop for Chiller Plant 6 and Chiller Plant 7.






                                                  information.






                                                                       Student Center from Chiller Plant 6 based on the location of other utilities and
                                          part of this master plan and is discussed in more detail in the Future Chilled
                                                                                 It is the desire of Facilities Management to connect the Frontiers Building to
                                             Water Distribution Strategies section. After this loop is complete, additional
                                                                    it would be difficult and costly to get chilled water piping over to the Parker
                                                            Center receive an addition. This addition would be served by stand-alone
                                                                 is also because Facilities Management has stated and SBEC agrees that
                                                                                    Chiller Plant 6 even though Chiller Plant 6 is housed in the West Campus
                                                  building at 19th Street and Illinois Street will be added to the loop further
                                                     reducing the spare capacity of Chiller Plant 6 to approximately 113 tons.
                                                               cooling equipment as that is the existing building’s cooling strategy. This
                                                 ce
                                                         The Facilities Master Plan recommends that the Ben H. Parker Student
                                               buildings including Research 1 through Research 3 as well as the offi




                                                                                          neighborhood. Chiller Plant 6 will have sufficient spare capacity following the  Campus Infrastructure Upgrade Project and piping is also being routed in the  direction of the Frontiers Building as a part of that project. From meetings with Facilities Management, there is a strong desire to loop  Chiller Plant 6 and Chiller Plant 7 together. Per Facilities Management, the  benefits of looping the c
















                                                                          tunnels.  RESEARCH PARK
   236   237   238   239   240   241   242   243   244   245   246