237
                                                  existing direct buried chilled water taps from Chiller Plant 6 just north of
                                             Green Center Chiller Plant 7 at the corner of 16th Street and Arapahoe
                                               Street would also need to travel west along 16th Street and tie into the
                                                     Alderson Hall. This section of new piping is all anticipated to be direct
                                          Additionally, in order to make a loop, the chilled water piping from the















                                                        buried above the tunnel network. It is anticipated that prior to looping an additional chiller plant located within  the Research Park neighborhood will be provided to provide redundancy and/ or additional future capacity within the system. This plant is anticipated to be  a back-up plant only as a part of this master plan. Once Chiller Plant 6 and  Chiller Plant 7 are looped and all anticipated buildings are brought online,  Ch


















                                          
                                               maintain minimum chilled water flows until more buildings were connected to
                                                  the system. However, it is believed that enough buildings, load, and diversity
                                                        necessary. SBEC has not further evaluated these control deficiencies or the
                                                           previously recommended corrective measures as a part of this master plan
                                                     are currently connected to Chiller Plant 6 that the bypasses are no longer
                                          the bypass loops in the system will help the plant operate at the desired
                                                                     ow
                                             temperature differential. The bypasses were originally designed to help
                                                                  ow
                                                                  ow measurement, fl






                                                                 This approach would also require additional fl




                                                                       directions and pipe sizes, and analyze the overall distribution. Additionally,  specific control strategies would need to be applied such that both plants  accommodate the anticipated load of the Research Park neighborhood.  New 14” chilled water pipes from the Green Center Chiller Plant 7 would  need to route south through the proposed Art Center parking structure to  16th Street. From here, the pipes are anticipa
                                                                    modeling, and plant surveys to confirm diversity, appropriately plan fl  If these measures were correctly implemented, the two plants could  Below is a description of the proposed pipe size and distribution.
                                                                             operate together as one system.  just south of the Frontiers Building.











                                                             report.                         