Page 245 - Mines Facilities Plan
P. 245

239






















                                          OFF-CAMPUS (EDGAR MINE) The Facilities Master Plan recommends two new buildings for the Edgar Mine  site in Idaho Springs. As these buildings are not on the Main Campus, they  will receive dedicated building systems. It is anticipated that each building  will have a dedicated variable air volume rooftop unit with direct expansion  cooling and a dedicated gas fired condensing boiler to provide hydronic     heating throughout the building. Becau








































                                          CAMPUS ELECTRICAL PRIMARY LOOPS The existing Mines campus primary electrical Loop 1A/1B starts at the new  Vista 624 switchgear on the north side of the Wright Wellness Center. The  primary loop cables, then takes a path through the northern part of campus  (Side 1A) to an S&C Vista switchgear at Stratton Vault, and then travels  back to metal clad switchgear at the Wright Wellness Center through the  center of campus (Side 1B). A normally op