INNOVATION HUB The Facilities Master Plan recommends four (4) total projects within the  Innovation Hub neighborhood. These result in three (3) total buildings  which have relatively smaller cooling loads. New construction along with  the renovation of a truck shop would combine to form one new building  called the Student Innovation Hub. The remaining two buildings would be  an Athletics Office Building and an Earth Innovation Hub. The Innovat









                                                    cient     cient
                                                                    supply and return lines are capped and ready for expansion near Chauvenet
                                                                                     combined and looped with Chiller Plant 6 as a part of this master plan and is
                                                                                  tons for future additions based on the applied diversity. Chiller Plant 7 will be
                                                         The utilities master plan recommends that Chauvenet Hall and Stratton Hall
                                             approaching its useful and expected service life of approximately 23 years.
                                                                                           section. After this loop is complete, additional buildings including Research
                                                                                        discussed in more detail in the Future Chilled Water Distribution Strategies
                                                                               and Chauvenet Halls, there would be an anticipated spare capacity of 948
                                                                 supply and return taps already exist for Stratton Hall and 14” chilled water
                                                               infrastructure to support the addition of these two buildings. Chilled water
                                                                       Hall. Chiller Plant 7 has the ability to provide approximately 2,483 tons of
                                                                          cooling when a diversity factor of 0.65 is applied. At present, considering
                                               Therefore, it should be replaced as soon as possible to avoid failure and
                                                  outages as the remaining chiller within Chiller Plant 4 does not have suffi
                                                                             diversity, the spare capacity is 1,138 tons. After the additions of Stratton
                                                            be added to Chiller Plant 7. Chiller Plant 7 has spare capacity and suffi
                                          Chiller Plant 4 houses a chiller which was installed in 1998 and that is
                                                     capacity to support the entire load even with diversity applied.
                                                                                                                      
                                                                                                1 through Research 3 as well as the office building at 19th Street and Illinois  Street will be added to the loop further reducing the spare capacity of Chiller   Colorado School of Mines Facilities Master Plan

                                                                                                   Plant 7 to approximately 137 tons.   234