Page 436 - Mines Facilities Plan
P. 436
Campus Load Xcel Capacity MV Feeders
2030
2029
2028 2027
Campus Electrical Load (Existing loads at 100%) (Existing loads at 100%) (Existing loads at 100%) 2026 2025
Master Plan - 2024 2023 2022 Year
2021
2020
2019
2018
800 700 600 500 400 Amps at 13.2 kV 300 200 100 0
The existing Mines campus primary electrical Loop 1A/1B
in the 2010 medium voltage master plan. The beginnings
new south campus primary loop as originally envisioned
switch can be closed to back feed either part of the loop
of the Wright Wellness Center. The primary loop cables,
starts at the new Vista 624 switchgear on the north side
(Side 1A) to an S&C Vista switchgear at Stratton Vault,
south side of the campus, creating an opportunity for a
then takes a path through the northern part of campus
Most of the future master planned buildings are on the
Wright Wellness Center through the center of campus
(Side 1B). A normally open way switch at the Stratton
of this loop were indicated in the original Master Plan
and then travels back to metal clad switchgear at the
Vault switchgear isolates Side 1A from Side 1B. This
CAMPUS ELECTRICAL PRIMARY
should any of the primary loop cables fail.
Welcome Center on Loop 2A.
(Loop 2). The first legs of this new loop include the radial feeders that serve the Student Recreation Center and Maple Hall with Loop 2B, and Wright Wellness Center, Weaver Towers, Elm Hall, Residence Hall VI, and Starzer The following graphs summarize the projected load growth on each of the campus loops and the Xcel Energy Colorado School of Mines Facilities Master Plan
LOOPS service. 430